BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 27, 2025 at 8:00 PM

Updated May 28, 2025

This is a service / maintenance or supply contract in Philadelphia, Pennsylvania. Contact the soliciting agency for additional information.

Any Questions or Request for Clarification Regarding This Rfq and the Attached Documents Must Be Submitted via online No Later Than 2:00pm Est on May 5, 2025. Please Submit Pricing for (2) 10" Nordstrom 2249 Plug Valves. No Alternatives Accepted. Need-by Date: July 11, 2025. Nordstrom 10" 2249 Plug Valve, ASME Class 600, Raised Face Flange Ends, Cast WCC Body, Cast Iron Plug, Carbon Steel Seat, Dynamic Balance, Regular Pattern, API 6D, Material Test Reports (MTRs) REQUIRED. BIDS WILL BE DEEMED NON-RESPONSIVE, IF BIDDERS - TAKE EXCEPTIONS TO PGW'S SPECIFICATIONS OR TERMS AND CONDITIONS - MUST BID ON THE BRAND SPECIFIED, PER ATTACHED SPEC 3156, NO SUBSTITUTES - FAIL TO PROVIDE PRICING AND LEAD TIME All Questions Must Be Asked During the Clarification Period Bidders Are Requested to Quote the Following: Payment Terms: Net 30 Days, Freight: Paid, F.o.b.: Destination. Please Note That Pgw is Eligible to Participate in Costars, Njpa, Omnia Partners, Naspo and/or State/city of Philadelphia Contract Pricing. Please Include the Contract Number on Your Rfq if Applicable. If You Are a Certified Minority, Woman, Veteran, or Disabled Owned Business, When Submitting Your Bid Response, Please Be Sure to Include a Copy of Your Most Current Certification for Verification Purposes. Additional Notes: (1) the Basis of Award for the Successful Vendor Shall Result in One (1) Purchase Order to the Lowest Responsive, Responsible Bidder That is Able to Meet the Required Delivery Date of July 11, 2025. If No Bidder is Able to Meet the Required Delivery Date, Pgw Will Award to the Lowest Responsive, Responsible Bidder Whose Delivery Date is Closest to the Required Delivery Date. if Lowest Bid Price is Equal, the Following Factors Will Be Taken Into Consideration to Determine the Award: 1. Lead-time 2. Best and Final Offer (Bafo) Vendors Will Be Notified Accordingly by the Respective Buyer if Any of These Factors Are Applied. (2) Late Delivery Penalty - in Case of Delayed Delivery of Any Shipment, Starting From the Second Week of Delay, Pgw Will Deduct Two [2] Percent of the Contract Price for Every Week of Delay. Sum of the Above-mentioned Penalty Shall Not Exceed Ten [10] Percent of the Total Contract Price. Payment of the Late Delivery Penalty Shall Not Relieve Bidder From the Obligation of Continuing Delivery of the Contracted Items. Required Delivery Date for All Items: July 11, 2025. (3) Any Bidder That Has Had a Purchase Order With Pgw Terminated During the Previous Three (3) Years Due to Breach or Default May Be Deemed Non-responsive and Non-qualified for This Rfq (4) Contractor Will Be Bound by Pgw's Policy and Procedure for the Debarment and Suspension of Vendors. Suspension or Debarment and Suspension of Vendors and Contractors Will Be Considered as Default by Contractor.

Post-Bid

Water / Sewer

Public - City

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 8, 2025

June 6, 2025

Project location map

1150 Ivy Hill Rd, Philadelphia, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.