BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 22, 2025 at 8:00 PM

Updated June 23, 2025

Site work and new construction of a pre-engineered storage facility in O Fallon, Missouri. Completed plans call for the construction of a 14,000-square-foot, one-story above grade pre-engineered storage facility; and for site work for a pre-engineered storage facility.

Project Number: 241867.00 Project is a 1 story new construction PEMB building with masonry stone band. A new plaza will be constructed between an existing building to the north of the new building project. Interior contains a market, kitchen, classrooms, offices and support spaces. St. Charles Community College (SCC) invites sealed bids for the Dardenne Creek Campus, Field to Table Institute project. SCC is seeking qualified General Contractors for the construction of a ~14,000 sf single-story Pre-Engineered Metal Building structure, that will include stone exterior accenting. A new plaza will be developed between the new building and the existing culinary structure to the north. The interior of the building will include a market / cafe, kitchen, classrooms, offices, and various support spaces. Questions regarding the bid should be submitted to Micheal Barkoviak at mbarkoviak@jemastl.com and Nick Fiehler at nick@navigatebuildingsolutions.com, CC Jeff Hyatt at jhyatt@stchas.edu. *Wright Construction requests bids by 12:00 p.m. EST on June 3, 2025. Bids will be accepted via email: bids@wrightconstruct.com Addendum B has been issued.

Award

Warehouse / Distribution - Pre-Engineered Storage Building

$6,125,000.00

Public - County

New Construction, Site Work

121

29

122

8

Subscribe For Documents

79 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
233
Active Projects
132
Bidding Soon
1,244
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 5, 2025

June 20, 2025

Project location map

1 Academy Pl, O Fallon, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.