Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 24, 2025 at 8:00 PM
Updated July 25, 2025
Site work and paving for a road / highway in Flagstaff, Arizona. Completed plans call for site work for a road / highway; and for paving for a road / highway.
**As of July 23rd, 2025, the project was awarded to B4 Enterprises, with an awarded amount of $2,291,628.25.** PZ-23-00058 This project will construct the Switzer Canyon FUTS trail. The trail will be approximately 3/4 mile in length and will be an aggregate-surfaced, non-vehicular, multi-use trail. Some sections of trail will be concrete due to steeper grades. The trail will start on the west end at the eastern terminus of Terrace Avenue to the intersection of Switzer Canyon Drive on the eastern end. This trail will provide a key connector route to and from downtown Flagstaff for pedestrians and bicyclists traveling to McMillan Mesa, Buffalo Park, USFS Trails, and the Arizona Trail on the north side of Flagstaff. It will create access to City of Flagstaff Open Space along the south side of the mesa and utilize a FUTS easement through private land on the eastern slope of the mesa. The trail will help to concentrate social trails in the area and aid in cleanup efforts in an area which sees sizable littering, transient camping, and illegal dumping. Response Types Line Items Type of Award Lump Sum Question Deadline 05/21/2025 at 3:00 PM MT
Award
Roads / Highways
$2,921,628.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 30, 2025
June 30, 2025
Multiple Locations, Flagstaff, AZ
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
