BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 15, 2025 at 8:00 PM

Updated July 16, 2025

Site work for a water / sewer project in Wakonda, South Dakota. Working plans call for site work for a water / sewer project.

**As of July 15, 2025, the owner has selected a Construction Manager. A timeline for construction has not yet been established.” Clay Rural Water System (Owner) is soliciting Requests for Proposals with Statements of Qualifications from qualified firms to provide Construction Manager at Risk (CMAR) services for both Design Phase and Construction Phase services for the following Project: Clay Rural Water System (CRWS) Chapter Project/Phase-II-Water Treatment Plant This Project consists of the installation of two (2) new production wells along with piping to a new water treatment plant (WTP) located adjacent to their existing WTP near Wakonda, South Dakota. The new WTP plant will have a capacity of 2.5-million gallons per day (MGD) with future expandability to 5 MGD. The new WTP building with offices, lab and shop included, will be approximately 140 ft x 130 ft and constructed of precast insulated concrete walls. New equipment including that required for lime-soda ash softening, square concrete solids contact basins, pre-manufactured media filtration tanks, CO2 storage and chemical dosing systems/rooms are included as part of the design. The existing sludge ponds will be reused with discharge piping modifications. Construction of a new clearwell and SCADA controls for the new WTP are under separate contracts and not part of this Project's scope. The CMAR will begin in an agency support role for the design phase services and will hold the construction contract(s) with the Owner for the construction of the project. Additional design phase services may include value engineering and early process equipment procurement. An estimated guaranteed maximum price (GMP) will be established, and the CMAR will revise the GMP through the Project's design. Prior to construction, the CMAR will submit a finalized guaranteed maximum price (GMP). Following acceptance of the GMP by the Owner and execution of GMP contract(s), the CMAR will assume the risk of delivering the project. The Project has CRWS' board approval and funding secured at this budget. Deviation above the approved funding amount will require modifications to the Project's scope and/or additional funding approval. Construction is expected to begin in Spring 2026 with substantial completion of construction anticipated by the end of 2027. The Owner does not presently plan to conduct an Informational Conference or a Site Visit with the Proposers at this stage of the CMAR selection process. The Owner reserves the right to reject any and all Proposals and to waive any irregularities or informalities therein and to award the CMAR Contract in the best interests of the Owner. No Proposer may withdraw their Proposal for a period of thirty (30) days after the submission deadline. Direct inquiries regarding this RFP, its documents, or submission requirements via email to both: Brian Hoellein, PE at Brian.Hoellein@bartwest.com Leah Moe at Leah.Moe@bartwest.com The Issuing Office for the RFP documents is Bartlett & West, 2921 E. 57th Street, Sioux Falls, South Dakota 57108. Prospective Proposers may examine the documents at the Issuing Office on Mondays through Fridays during regular business hours and may obtain copies of the documents from the Issuing Office as described below. The documents may also be examined at the office of Clay Rural Water System, 30376 SD Hwy 19, Wakonda, South Dakota 57073 on Mondays through Fridays during regular business hours. Question Deadline 05/23/2025

Pre-Construction/Negotiated

Water / Sewer

$16,000,000.00

Public - City

Site Work

37

7

2

7

Subscribe For Documents

41 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
40
Bidding Soon
482
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 30, 2025

March 2, 2026

Project location map

30376 SD-19, Wakonda, SD

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.