Published June 10, 2025 at 8:00 PM

Updated June 11, 2025

Site work for a water / sewer project in St George, Utah. Completed plans call for site work for a water / sewer project.

The City of St. George is requesting bids to: Furnish and Install 3200 feet if 36 inch SDR sewer main and manholes. Question Deadline 05/21/2025 at 2:00 PM MT Location online portal. Project Address: ____Fort Pierce Dr & Bloomington Hills Dr_ Every BID shall be accompanied by a bid bond in the amount of 5% of the BID, naming the City of St. George as obligee, this bid bond must be issued by a surety company licensed to do business in the State of Utah and be on a bond form acceptable to the City of St. George. The 100% performance - labor and materials bond will be required on this project. The City of St. George reserves the right to reject any or all PROPOSALS or to waive any formality or technicality in any PROPOSAL in the interest of the city. The project consists of constructing a 36-inch diameter sewer line adjacent to existing 10-inch and 18-inch diameter sewer lines. The project extends along the St. George Golf Club from approximately the south side of Fort Pierce Drive in St. George Utah to the edge of Fort Pierce Wash. There is existing asbestos concrete pipe adjacent to the new 36-inch sewer pipe alignment. The contractor shall take precaution to not expose this existing pipe except as noted in the construction drawings to extending existing mains to the new 36-inch line and to replace sections of the existing 10-inch line with the new 36-inch line. The contractor shall notify the City of St. George at least 48 hours in advance of any excavation in the vicinity of existing asbestos concrete lines. The contractor will exercise caution to not disturb any asbestos concrete lines during construction. If an asbestos concrete line conflicts with new construction the contractor shall contact the City. The City will remove and properly dispose of disturbed asbestos concrete sewer pipe that is necessary for the completion of the project. The Contractor is responsible to maintain sewer service during the progression of the work. The Contractor is also responsible to notify homeowners that will be affected by construction 48 hours in advance of construction activities. No single homeowner shall have the sewer out of service for more than two consecutive days and for no more than 8 hours at a time. All sewer services shall function between the hours of 6:00 p.m. and 8:00 a.m.

Award

Water / Sewer

$2,300,915.00

Public - City

Site Work

21

5

2

5

Subscribe For Documents

44 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
28
Active Projects
16
Bidding Soon
155
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 22, 2025

June 15, 2025

Project location map

Multiple Locations, St George, UT


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.