Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published July 10, 2025 at 8:00 PM
Updated July 11, 2025
Site work for a bridge / tunnel in Green River, Wyoming. Completed plans call for site work for a bridge / tunnel.
**As of June 25, 2025 , this project has not yet been awarded. The project is expected to be awarded on July 1st, 2025.** The Contractor shall complete all Work as specified and as indicated in the Contract Documents. The Work is generally described as follows Concrete Lining of the double barrel 96" CMP Culverts at the Big Sandy River on County Road 101. All work shall be completed as per the 2021 Edition of the Wyoming Standard Specifications for Road and Bridge Construction. Concrete Lining of the double barrel 96" CMP Culverts at the Big Sandy River on County Road 101.
Award
Bridges / Tunnels
$100,778.00
Public - County
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 5, 2025
July 7, 2025
80 W Flaming Gorge Way, Green River, WY
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
