BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 4, 2025 at 8:00 PM

Updated June 5, 2025

Site work and paving for a mixed-use development in Green River, Wyoming. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The project is comprised of reconstruction of a portion of Bridger Drive and associated utility improvements. This project is within the limits of the City of Green River, Wyoming. The project includes the removal and replacement of existing asphalt and base, the removal and replacement of existing concrete sidewalk and base, and the removal and replacement of existing concrete curb and gutter and base. Supply and installation of geogrid for subgrade stabilization will also be included. Utility improvements include improvements to the water system by the removal of only portions of existing water mains and replacement with PVC water main. Proposed water system improvements consists of installation of approximately 144 linear feet of 12" diameter PVC, installation of valves/fittings, installation of a fire hydrant assembly, installation of 11 curb stops along Bridger Drive, removal of approximately 54 linear feet of 6" asbestos cement water main and 166 linear feet of 12" asbestos cement water main and replacement with 8" PVC water main and installation of 12" and 8" valve/fittings, removal of a 12" valve and installation of a Pressure Reducing Valve. Storm drain improvements include installation of 10 storm drain catch basins and approximately 1,110 linear feet of 18" diameter corrugated high density polyethene pipe. Storm drain improvements will also include a tie-in to an existing storm drain catch basin. All associated miscellaneous work necessary to complete the project in accordance with the Drawings and Specifications is included. Site Directions: The project site will consist of the portion of Bridger Drive from W. Teton to E. Teton. Take I-80 Exit 91 in Green River and head south on Uinta Drive by going around the Cow Pasture Park Loop. Take a left onto Astle at the first light past the Green River Bridge. Continue for approximately 1.5 miles to the intersection of W. Teton and Bridger. Construction will take place before that intersection to the intersection of Bridger and W. Teton, approximately 1,400 feet to the west. ** pre bid link : The link for the Microsoft Teams meeting is provided below: https://teams.microsoft.com/l/meetup-join/19%3ameeting_YTlhYzhhMTItOWZmNC00NjAxLTk0YmUtYTExNjNiNGZhNjQ4%40thread.v2/0context=%7b%22Tid%22%3a%22e7921e20-ebff-4eed-9932-ff8ae8aa8fae%22%2c%22Oid%22%3a%22c6e75ac1-0f9f-47af-bb1b-b33905a5ae40%22%7d

Award

Roads / Highways

$1,521,081.00

Public - City

Paving, Site Work

33

7

5

7

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
17
Active Projects
15
Bidding Soon
84
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 15, 2025

June 16, 2025

Project location map

Bridger Dr, Green River, WY

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.