BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 10, 2025 at 8:00 PM

Updated July 11, 2025

Site work for a bridge / tunnel in Green River, Wyoming. Completed plans call for site work for a bridge / tunnel.

**As of June 25, 2025 , this project has not yet been awarded. The project is expected to be awarded on July 1st, 2025.** The Contractor shall complete all Work as specified and as indicated in the Contract Documents. The Work is generally described as follows Concrete Lining of the double barrel 96" CMP Culverts at the Big Sandy River on County Road 101. All work shall be completed as per the 2021 Edition of the Wyoming Standard Specifications for Road and Bridge Construction. Concrete Lining of the double barrel 96" CMP Culverts at the Big Sandy River on County Road 101.

Award

Bridges / Tunnels

$100,778.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
16
Active Projects
2
Bidding Soon
88
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 5, 2025

July 7, 2025

Project location map

80 W Flaming Gorge Way, Green River, WY


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.