Published July 2, 2025 at 8:00 PM

Updated July 3, 2025

Renovation of an educational facility in Irvine, California. Working plans call for the renovation of a educational facility.

**As of July 2, 2025, the project is on hold. No definite date for the rebid.** DESCRIPTION: SCIP 21/22 Med Surge 2 Rooms 372, 378, and 385: Work includes the following: Replacement of existing fume hood with a new 4-foot ADA fume hood. Removal of an existing door between Rooms 372 and 385, patch the door jamb/head, and create a cased opening between Rooms 372 and 385. Clean the existing lab benches and provide new tables, the scope for new tables will be a bid alternate. Install new flooring and install new floor base throughout. Paint the walls/ceilings, and doors/door frames throughout. Provide mechanical exhaust ducting for the 4-foot fume hood, which is to be reworked/replaced. Replace lab sinks, hot/cold water faucets, and DI water faucets. Replace the existing light fixtures with new LED light fixtures. Provide a new dimming switch system and new ceiling motion sensors. Install new data cables from Telecom Room 361B and provide Wiremold lab bench pedestal table boxes for the tabletop data jacks. Provide eight (8) data jacks at each large benchtop; total of sixteen (16) data jacks. Additional scope includes the addition of a 6-foot fume hood and a centrifuge in Lab 385, a -80C freezer in Lab 372, and a free-standing emergency eyewash/shower in Lab 378. Eyewashes are also added at each of the three sinks in the scope of work. The existing casework and electrical raceway will also need to be reworked to accommodate the 6-foot fume hood. An exhaust fan to serve the 6-foot fume hood is also part of the scope of work. Construction Duration: 120 Calendar Days Estimated Construction Cost: $700,000 The following projects are intended to be bid as one single project: Med Surge 2 Renovations: This project includes, but is not limited to, the removal and replacement of the existing fume hood, addition of fume hood fire extinguisher and tie into fire alarm system, repair and cleaning of casework, removal and replacement of acoustical panels, removal and replacement of lights and lighting system, installation of new mechanical ducting, rooftop unit and related roof modifications. Abatement of hazardous materials will be required. Construction Duration: 90 Calendar Days Estimated Construction Cost: $530,000 Med Surge 2 HVAC Maintenance: This project includes, but is not limited to, the removal and replacement of the existing rooftop air handler and exhaust fan and related ductwork, removal and replacement of existing interior ductwork, systems controls, and mechanical piping. The abatement of hazardous materials will be required. Construction Duration: 90 Calendar Days Estimated Construction Cost: $240,000 Contact Ladita McBride, Senior Contracts Analyst at (949) 824-1190 or laditam@uci.edu for the questionnaire.

Final Planning

Educational

$1,470,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
607
Active Projects
218
Bidding Soon
3,966
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 27, 2025

January 2, 2026

Project location map

To Be Determined, Irvine, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.