Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 15, 2025 at 8:00 PM
Updated July 16, 2025
Renovation of an educational facility in Kenosha, Wisconsin. Completed plans call for the renovation of a educational facility.
The purpose of this Request for Proposal (RFP) issued by the Kenosha Unified School District (the District), is to acquire proposals from qualified contractors for the installation of playground equipment and new PIP surfacing at two elementary schools. The project will use the Federal Prevailing Wage Rates for all contractors involved with the scope of work. Certified payroll must be submitted with payment requests. The federal prevailing wage rate determination is attached to this document. The District will negotiate and administer this Turn-Key contract agreement on behalf of all schools and departments of KUSD and will make any payments due under such an agreement or contract. The requirements, provisions, and terms and conditions included in the RFP document will apply to any contract or agreement awarded as a result of this RFP and is the terms and conditions upon which the District will base negotiations. The Request for Proposal does not guarantee a purchase will be made. Service start date can be on June 16th 2025 and must be completed no later than July 31, 2025. Bidders must provide a complete construction schedule with bid response. Bidders with doubt as to the true meaning of any requirements or specifications included in this RFP must submit a written request for clarification to the District personnel listed below: Corki Roth - Purchasing 3600-52nd Street Kenosha WI 53144 Phone 262-359-7656 Email croth@kusd.edu The Kenosha Unified School District (KUSD) reserves the right to accept or reject any or all bids/proposals, to waive any informality or technicality in any bid/proposal submitted, and to accept any part of a bid/proposal deemed to be in the best interest of KUSD. KUSD reserves the right to negotiate with any company after the bid opening has occurred. The Request for Proposal does not guarantee a purchase will be made. SCOPE OF WORK: Location 1: Frank Elementary School: 1816 57 St, Kenosha, WI Location 2: Curtis Strange Elementary: 5414 49th Ave, Kenosha, WI Location 3: Wilson School Elementary: 4520 33 rd Ave, Kenosha, WI (Removal Site) Frank Elementary School: Installation of an existing Synergy Modular Play Structure (concrete slab bolted installation). Installation of a PIP playground surface within an existing asphalt playground area on top of a new curbed 5 concrete pad. Site excavation and subbase installation, asphalt cutting / patching and site restoration is included in this scope. This Play Structure is currently in storage at our KUSD warehouse. Contractor is to inventory the existing parts and provide any replacement or missing parts as part of this contract. Contractor will be responsible for the delivery of the playset components from our KUSD Warehouse to the Frank School site. Curtis Strange Elementary School: Installation of an existing relocated Synergy Modular Play Structure (Direct Burial Installation). Installation of PIP playground surface within an existing asphalt playground area. Site excavation and subbase installation, new concrete curbing, asphalt cutting / patching, and site restoration is included in this scope. Contractor will be required to remove and relocate the existing playset structure from Wilson School Site (Location 3) to Curtis Strange. Contractor is to inventory the existing parts and provide any replacement or missing parts as part of this contract. Wilson Elementary School: The existing PIP surface at Wilson will remain a Bd result - Base Bid 1 - Lee Recreation - $99,125.00 Base Bid 2 - Lee Recreation - $73,375.00
Award
Educational
$172,500.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 20, 2025
June 16, 2025
Multiple Locations, Kenosha, WI
Related To This Project
Kenosha, WI
Bid Date: May 22 2025
Kenosha, WI
Bid Date: May 28 2025
Kenosha, WI
Bid Date: Jun 02 2025
Kenosha, WI
Bid Date: Jun 12 2025
Kenosha, WI
--
Kenosha, WI
Bid Date: Jun 11 2025
Kenosha, WI
Bid Date: Jun 11 2025
Kenosha, WI
Bid Date: Jun 17 2025
Kenosha, WI
Bid Date: May 21 2025
Kenosha, WI
Bid Date: May 21 2025
Kenosha, WI
Bid Date: May 14 2025
Kenosha, WI
Bid Date: May 14 2025
Kenosha, WI
Bid Date: May 15 2025
Kenosha, WI
Bid Date: May 15 2025
Kenosha, WI
Bid Date: Apr 22 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
