BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 15, 2025 at 8:00 PM

Updated September 16, 2025

Site work for a power facility in Holyoke, Massachusetts. Working plans call for site work for a power facility.

Project is cancelled. Labor contract associated with the 115kV 1894 Line Rebuild project. The scope of this project is to replace the existing wood poles(15) and associated hardware on the 115kV 1894 Line between Holyoke and North Canal Substations. This contract will be for a Transmission Line Contractor to erect the new structures, install hardware, and transfer the existing 795 ACSR conductor, fiber optic cable, and distribution underbuilt to the new structures. This will include demolition and disposal of existing equipment. Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. Prevailing Wage Rates apply. All Bidders are required to submit a Bid Deposit equal to 5% of the total bid value. The successful Bidder will be required to furnish a satisfactory Payment & Performance Bond equal to 50% of the total bid value. The 1894 Line is a 115kV transmission line connecting Holyoke Substation 17L to North Canal Substation 44P in Holyoke, MA. The line is approximately 0.8 miles in length, and consists of 20 structures and 795 ACSR Tern conductor. The scope of the contract is to replace fifteen (15) wood pole structures with direct embedded ductile iron pole structures and transfer of the existing conductor and shield wire to the new structures. The four (4) existing steel pole Structures A, 1, 7, 19 and one (1) ductile iron pole Structure 9 will be reused. Under this contract, new pole line hardware is to be installed on the fifteen (15) new structures, pursuant to the design drawings included in this IFB. In addition, the existing fiber optic cable, distribution underbuild, and all other attachments are to be transferred over to the new structures as applicable. Interested Bidders are to provide labor, equipment and any other subcontractors required for all work as specified herein. Pole line hardware, as detailed in the attached material list, will be supplied by HG&E. It is the responsibility of the Contractor to provide any additional materials not included in the attached material list that are deemed necessary for the job based on the review of design drawings. It is expected that work under the contract will be completed during the Fall (October-December) of 2025.

Final Planning

Power Plant

$175,000.00

Public - City

Site Work

18

7

2

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
609
Active Projects
198
Bidding Soon
4,433
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 24, 2025

July 6, 2026

Project location map

102 Cabot St, Holyoke, MA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.