BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 16, 2025 at 8:00 PM

Updated July 17, 2025

Renovation of a theater / auditorium in Aurora, Colorado. Completed plans call for the renovation of a theater / auditorium.

Reference Number 0000386548 The Fox Theater Seat Replacement Phase II project includes, but is not limited to: Protect carpet from all work. Disconnecting the power to the existing upper/balcony end of aisle seat for the aisle lights. Patching the floor at the existing seat anchor locations. Seat anchor/seat removal by others. Sawcut, trench and patch lower-level concrete. Provide new conduit in lower-level trench for power to new aisle lighting. Prepare the existing concrete floor space for new epoxy floor finish and slip resistance additive. Prepare and paint the existing plywood enclosure surrounding the audio equipment with latex based, semi-gloss paint to match epoxy flooring. Apply epoxy color system to both flat and vertical sections of theater seating (Typical of 3 locations). Circuit and connect new power to lower-level aisle seats. Reconnect new seats in upper/balcony level to existing power circuit. New seat anchor/seat installation by others. Milestone Schedule Disconnect Power to Existing Seats - July 28th, 2025 Sawcut/Trench Lower Level - July 30th, 2025 New Concrete Patch at Lower Level - August 7th, 2025 Epoxy finish (Upper & Lower Level) - August 8th, 2025 Connect New Power to New Seats - August 14th, 2025 Liquidated Damages which are $800.00 per day. Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 % Each Bid shall be accompanied by an appropriate guarantee in the form of a Bid Bond made payable to the City of Aurora in an amount of not less than five percent (5%) of the amount of the Bid. Construction period: July 28th, 2025, to August 22nd, 2025. If items such as material lead times or any other market conditions prevent completion by August 22nd, 2025, bidders must notify the City of requested changes to the construction period by the question period deadline. Question Deadline 05/23/2025 at 3:00 PM MT Questions are submitted online No . Written inquiries shall be emailed to: Angie Young, Senior Procurement Agent, at ayoung@auroragov.org AND Gabrielle Tobin, Project Manager, at gtobin@auroragov.org. The estimated cost for this project is from $86,446.80 to $96,052.00. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. bid open notes : ID: 220 622 047 438 Passcode: t3Bf7MP2 Dial in by phone +1 720-388-8447,,573043597# United States, Aurora Find a local number Phone conference ID: 573 043 597#

Award

Theaters / Auditoriums

$60,819.00

Public - City

Renovation

9

9

7

6

Subscribe For Documents

65 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
275
Active Projects
117
Bidding Soon
1,226
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 4, 2025

July 28, 2025

Project location map

9900 E Colfax Ave, Aurora, CO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.