BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 25, 2025 at 8:00 PM

Updated August 26, 2025

Demolition, site work, paving, outdoor lighting and new construction of a mixed-use development in Montpelier, Vermont. Completed plans call for the demolition of a transportation facility; for the construction of a road / highway; for site work for a transportation facility; water / sewer project; road / highway; for outdoor lighting for a road / highway; and for paving for a road / highway.

The deadline for submitting inquiries related to this Contract is 4:30 p.m. Eastern Time on May 21, 2025 May 28, 2025 Location: NECR MP 14.8 Type of Construction: Improvements to the Site Include Demolition of the Existing Platform and Construction of a 300' Long, Low-level Train Boarding Platform. Including New Drainage, Pavement, Lighting, Striping, and Signing to Delineate Accessible Routes to the Train Station Waiting and Boarding Platform Areas. Contract Completion Date: This Contract shall be completed on or before February 27, 2026. Bid Bond: Electronic Bid Bond to Be Submitted in the Amount of 5% of the Contractor's Bid. Engineer's Estimate: for This Proposal the Engineer's Estimate is Category D: $1,000,000 - $2,500,000 During the advertisement period, all questions shall be addressed solely to the Office of Contract Administration via email: AOT.ConstructionContractingInquiry@vermont.gov. All inquiries must be received by 4:30pm on Wednesday, May 21, 2025. All Bidders on This Project Must Hold Both Current Annual Prequalification With the Vermont Agency of Transportation Through the "Contractor's Experience Questionnaire and Financial Statement" and Unconditioned Project-specific Approval Through the "Standard Form - Request for Proposal" Ca-82 Form. The Right is Reserved to Reject Any or All Bids, to Waive Any Formality, and Any and All Technicalities in Bids, and to Accept Such Bids as May Be Deemed in the Best Interest of the Awarding Agency. VTDOT: Hartford Plat(4) *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Transportation Terminals

$1,587,000.00

Public - State/Provincial

Demolition, New Construction, Outdoor Lighting, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
215
Active Projects
115
Bidding Soon
892
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 6, 2025

August 5, 2025

Project location map

To Be Determined, Montpelier, VT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.