BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 23, 2025 at 8:00 PM

Updated July 24, 2025

Site work and paving for a road / highway in Montpelier, Vermont. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The City of Montpelier is seeking contractors to perform Cold In-place Recycling (CIR) or Stabilized Full Depth Reclamation (SFDR) on a town highway. Towne Hill rd is in poor condition and is roughly 5200ft long. Prospective bidders should note that this project has an additional/alternative scope of work for either full length CIR or half CIR/ half SFDR treatments. Prospective bidders are welcome to visit the site at their convenience. Project limits begin roughly 250ft south of the Main St/Towne Hill Rd intersection and end at the town line. Prior to the opening of bids, it is assumed that each bidder will have inspected the sites and become thoroughly familiar with the contract documents, existing field conditions and limitations. Failure of a bidder to review all documents pertinent to the contract shall in no way relieve the bidder from the obligation with respect to their bid. Any questions regarding this project must be sent via email to Zach Blodgett, Deputy Director by June 30th at 10:00am. No other form will be accepted A brief description of the project site and intended construction scope follows. The estimated unit quantities are provided below. The City has issued this bid for a qualified contractor to perform Cold In-place Recycling (CIR) treatment to a town highway. Description The work may include, but is not limited to: Towne Hill Road o Pre-milling approx. 10' x 5200' to a depth of 4" (Est. removal of 640 CY). Pre-milling should include one pass on each side of the roadway. o Cold In-place Recycling of 24' x 5200' to a depth of 4" (Est. placement of 557 CY of pavement) o From #219 Towne Hill Road to approximately #169 Towne Hill Road the road will pitch away from the sidewalk towards the open ditch and then transition back to a traditional crowned roadway. Limits will be field marked. Main St o Pre-milling approx. 28' x 300' to a depth of 4" (Est. removal of 39 CY). Project limits have been field marked at existing pavement joints, approx. 250' south and 50\' north of Main/Towne Hill intersection. Bid Result Option #1 indus 249,991 Option #2 indus 321,027

Award

Roads / Highways

$571,018.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
112
Active Projects
43
Bidding Soon
829
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 3, 2025

August 4, 2025

Project location map

Multiple Locations, Montpelier, VT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.