Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 22, 2025 at 8:00 PM
Updated July 23, 2025
Site work and paving for a mixed-use development in Spicer, Minnesota. Completed plans call for site work for a playground / park / athletic field; sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.
As of July 8, 2025. PRoject was awarded to Brouwer Construction, LLC of Raymond, MN in the amount of $460,502.91. Site Directions: Diamond Lake County Park and CR 104 Project DIAMOND LAKE ACCESS-25, Reconstruction of the Diamond Lake Access near Diamond Lake County Park, trail construction from access to CSAH 28, and bituminous surfacing of CR 104. Combined estimated quantities of work are: Remove Bituminous Pavement - 2124 SQYD, Geotextile Fabric Type V - 3725 SQYD, Structural Soil Borrow 315 CUYD, Select Granular Borrow (CV) - 2326 CUYD, Common Excavation (P) - 4141 CUYD, Aggregate Base Class 5 - 1870 TON, Bituminous Mixture - 1736 TON, Coarse Aggregate Bedding - 94 TON, 18" RC Pipe Apron - 1 EACH, 4" Perforated PE Pipe Drain - 110 LF, 18" RC Sewer Pipe - 168 LF, Construct Drainage Structure Design G or H - 1 EACH, 6" Concrete Walk - 354 SF, Truncated Domes - 19 SF, Toilet Screen - 1 EACH, Deciduous Tree 2.5" Cal B&B - 4 EACH, Silt Fence Type MS - 772 LF, Common Topsoil Borrow - 104 TON, and other construction items. A bid bond in the amount of five percent (5%) of the bid must be uploaded with all bids. The County Board reserves the right to accept or reject any or all bids and to waive any defects or technicalities therein and to award the contract in the best interest of the County.
Award
Playgrounds / Parks / Athletic Fields
$460,503.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 2, 2025
August 4, 2025
Multiple Locations, Spicer, MN
Related To This Project
Spicer, MN
Bid Date: Jun 20 2025
Spicer, MN
Bid Date: May 22 2025
Spicer, MN
Bid Date: Apr 22 2025
Spicer, MN
Bid Date: Mar 25 2025
Spicer, MN
Bid Date: Mar 17 2025
Spicer, MN
Bid Date: Mar 14 2024
Spicer, MN
Bid Date: Jan 19 2021
Spicer, MN
Bid Date: Feb 08 2024
Spicer, MN
Bid Date: Jul 18 2023
Spicer, MN
Bid Date: Jul 18 2023
Spicer, MN
Bid Date: Mar 21 2023
Spicer, MN
Bid Date: Mar 22 2022
Spicer, MN
Bid Date: Mar 22 2022
Spicer, MN
Bid Date: Jun 07 2022
Spicer, MN
Bid Date: May 05 2020
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
