Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published July 28, 2025 at 8:00 PM
Updated July 29, 2025
Site work for a bridge / tunnel in Walker, Minnesota. Working plans call for site work for a bridge / tunnel.
As of July 28,2025, bids rejected. No definite date for the rebid. Guardrail replacement of Shingobee Road Bridge (NBI#11008) including but not limited to disassembling existing guardrail, guardrail post removal and replacement, installation of energy absorbing end terminals, and associated traffic control. Work includes but is not limited to disassembling of existing guardrail, guardrail post removal and replacement, installation of energy absorbing end terminals, and associated traffic control. The project end state will consist of raising the top of the bridge and approach guardrails to a height of 31.0 inches with new guardrail and posts to meet current FHWA requirements. The Work involves general construction consisting of the following major components as shown on the plans and specified herein: This project is for the replacement of 810 feet (0.15 miles) of bridge guardrail. Work includes but is not limited to disassembly of existing guardrail and wooden posts the alignment and installation of wooden posts and updated guardrail, installation of guardrail end treatments, and associated traffic control. The Work will be substantially complete on or before September 30, 2025 ; Final completion- October 30, 2025
Final Planning
Bridges / Tunnels
$300,000.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 9, 2025
January 28, 2026
Shingobee Rd NW, Walker, MN
Related To This Project
Walker, MN
Bid Date: Jun 10 2025
Walker, MN
Bid Date: Jun 09 2025
Walker, MN
Bid Date: Jul 28 2025
Walker, MN
Bid Date: Aug 22 2025
Walker, MN
Bid Date: Aug 12 2025
Walker, MN
Bid Date: Aug 19 2025
Walker, MN
Bid Date: Aug 26 2025
Walker, MN
Bid Date: Sep 03 2025
Walker, MN
Bid Date: May 01 2025
Walker, MN
Bid Date: Apr 17 2025
Walker, MN
Bid Date: May 29 2025
Walker, MN
Bid Date: Mar 25 2025
Walker, MN
Bid Date: Mar 25 2025
Walker, MN
Bid Date: Mar 25 2025
Walker, MN
Bid Date: Oct 29 2024
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed