Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 19, 2025 at 8:00 PM
Updated June 20, 2025
Site work and outdoor lighting for a transportation facility in Bridgeport, West Virginia. Completed plans call for site work for a transportation facility; and for outdoor lighting for a transportation facility.
**As of June 19, 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** The Project includes the following Work: replacement of existing incandescent runway edge lighting system with a new LED system and new cabling on existing infrastructure. The project will also include the replacement of Constant Current Regulators (CCRs), windcones, distance remaining signs and the installation of a new light control board. The Work will be substantially completed within 240 calendar days after the date when the Contract Times commence to run and completed and ready for final payment within 270 days after the date when the Contract Times commence to run. Liquidated damages shall be $500 per day Goals for minority participation for each trade: 1.5% Goals for female participation in each trade: 6.9% Bids shall be accompanied by a certified check or bid bond payable to Benedum Airport Authority in an amount equal to five percent (5%) of the base bid. All Bidders are required to have a West Virginia Contractors License per Section 21-11-11 of the West Virginia Code.
Bid Results
Transportation Terminals
$519,182.00
Public - City
Outdoor Lighting, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 29, 2025
June 30, 2025
2000 Aviation Way, Bridgeport, WV
Related To This Project
Bridgeport, WV
Bid Date: Jun 24 2025
Bridgeport, WV
Bid Date: Jun 23 2025
Bridgeport, WV
--
Bridgeport, WV
Bid Date: Aug 21 2025
Bridgeport, WV
Bid Date: Sep 08 2025
Bridgeport, WV
Bid Date: Sep 23 2025
Bridgeport, WV
Bid Date: Oct 03 2025
Bridgeport, WV
Bid Date: Apr 02 2025
Bridgeport, WV
Bid Date: Mar 06 2025
Bridgeport, WV
--
Bridgeport, WV
--
Bridgeport, WV
--
Bridgeport, WV
--
Bridgeport, WV
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
