Site work and paving for a sidewalk / parking lot in Porterville, California. Working plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.
DESCRIPTION OF WORK: The Work includes site and accessibility improvements at 5 elementary school sites in Porterville, California. Completed DIR Information: Within 24 hours of the opening of the bids, the apparent low bidder shall submit completed DIR information on the Subcontractor List to the Porterville Unified School District Operations Yard located at 534 N. "E" St, Porterville CA 93257. TIME OF COMPLETION: The Work shall be completed within 275 calendar days from the date of the Owner's Notice to Proceed. BID SECURITY: Submit bid security with proposal, made payable to Owner, in amount of 10% of the Bid, in the form of certified check, bid bond, cashier's check or cash. Bid security will be retained until Agreement is signed and required bonds furnished. If any bidder refuses to sign the Agreement Form within 7 days after Award, the Owner will retain his bid security as liquidated damages. To enable compliance with California Code of Civil Procedure Section 995.311, each contractor shall provide, prior to Contract Award, a print-out of information from the Department of Insurance website online confirming the surety is an admitted surety insurer. Doc note: Only bonafide general contract bidders may secure hard copies of the proposed Contract Documents from the Architect on the following basis: 1 Limited to 2 sets of specifications and drawings, upon payment of $225.00 deposit per set payable to Mangini Associates Inc., completely refundable if sets are returned to the Architect in good condition within 7 calendar days after bid opening. 2 A non-refundable charge of $20.00, made by separate check, will be required for all sets requiring shipping and handling. 3 Additional complete sets may be purchased from the Architect at the price of 1.15 times the Architect's cost of reproduction and delivery. 4 Specifications and drawings will also be issued to various online for subcontractors' use or subcontractors may purchase complete sets from the Architect at the price of 1.15 times the Architect's cost of reproduction and delivery. Purchased sets are non-refundable. 5 No partial sets or individual sheets will be issued or sold. 6 Only online will be notified of Addenda Event pre-bid note: AWARD: The Owner reserves the right to reject any and all bids and/or waive any informality in any bid received and/or determine in its discretion the responsibility of any bidder, and which bid is most advantageous to the Owner. Unless otherwise required by law, no bidder may withdraw his bid for a period of 60 days after the date set for the opening thereof, or any authorized postponement thereof. The Owner reserves the right to take more than 60 days to make a decision regarding the rejection of bids or the award of the Contract.
Final Planning
Sidewalks / Parking Lot
$2,500,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 4, 2025
July 30, 2025
Multiple Locations, Porterville, CA
Related To This Project
Porterville, CA
Bid Date: Jun 17 2025
Porterville, CA
Bid Date: Jun 18 2025
Porterville, CA
Bid Date: Jun 11 2025
Porterville, CA
Bid Date: Jun 05 2025
Porterville, CA
Bid Date: Jul 07 2025
Porterville, CA
Bid Date: Aug 22 2025
Porterville, CA
--
Porterville, CA
--
Porterville, CA
Bid Date: Jun 05 2025
Porterville, CA
Bid Date: Jun 03 2025
Porterville, CA
Bid Date: May 22 2025
Porterville, CA
Bid Date: Apr 30 2025
Porterville, CA
Bid Date: May 07 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.