Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 24, 2025 at 8:00 PM
Updated July 25, 2025
Site work for a water / sewer project in Phoenix, Arizona. Completed plans call for site work for a water / sewer project.
Reference Number 0000386374, . CY 2020-022 Bid Intent Not Available Notice is hereby given that Maricopa County (County) is conducting this invitation for SEALED BIDS for the work described herein: This project consists of installing new water lines throughout the Community of Tonto Hills and removing sections of the existing water lines as shown on the plans. Contractor is advised that the existing water lines to be removed include the following materials: ACP, DIP and PVC. Project also consists of sealing the existing road surfaces with chip seal where water line work will occur. The project includes traffic control, clearing and grubbing when trenching will be done outside the limits of the existing chip sealed roadway and hydro-seeding these areas. This project is located in within Maricopa County, Arizona within Township 1N and Range 5E and Sections 10 and 15 in the Community of Tonto Hills. Question Deadline 07/01/2025 at 5:00 PM MT Questions are submitted online Yes, Questions or clarifications regarding the bid documents shall be addressed through online under the Questions and Answers link. Minor administrative questions may be sent to Article 5 Procurement Officer, Corry Slama at Corry.Slama@maricopa.gov. All questions or clarifications must be received by the County at least seven days prior to bid opening date. Pre-bid Conference: Please confirm your attendance for the teleconference no later than 24 hours prior to this conference by sending an email to Corry Slama, Corry.Slama@Maricopa.gov. Include your firm's name and conference attendees in the email. All interested bidders are encouraged to attend. All construction work on this contract is to be completed within 180 CALENDAR DAYS beginning with the date specified in the Notice to Proceed. Exclusive of and following the contract time allowed for construction work are 120 CALENDAR DAYS for internal administrative purposes thereby resulting in a total contract performance period of 300 CALENDAR DAYS. The Board of Supervisors (BOS) reserves the right to reject any and all bids and to waive any informality in any bid received.
Bid Results
Water / Sewer
$2,130,360.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 22, 2025
November 14, 2025
Multiple Locations, Phoenix, AZ
Related To This Project
Phoenix, AZ
--
Phoenix, AZ
Bid Date: May 29 2025
Phoenix, AZ
Bid Date: May 21 2025
Phoenix, AZ
Bid Date: Jul 02 2025
Phoenix, AZ
Bid Date: May 29 2025
Phoenix, AZ
Bid Date: May 21 2025
Phoenix, AZ
Bid Date: May 30 2025
Phoenix, AZ
Bid Date: May 15 2025
Phoenix, AZ
--
Phoenix, AZ
Bid Date: May 20 2025
Phoenix, AZ
Bid Date: Aug 22 2025
Phoenix, AZ
Bid Date: May 30 2025
Phoenix, AZ
Bid Date: May 23 2025
Phoenix, AZ
Bid Date: May 30 2025
Phoenix, AZ
Bid Date: Jun 13 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
