Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 13, 2025 at 8:00 PM
Updated May 28, 2025
Renovation of a water / sewer project in Mansfield Center, Connecticut. Completed plans call for the renovation of a water / sewer project.
The project encompasses the acquisition/purchasing and installation of a new HVAC system at Windham Water Works. The Florida Department of Agriculture and Consumer Services (FDACS or Department) seeks to obtain competitive bids for the renovation of the Agricultural Environmental Services (AES) Lab 7 (Phase II) in accordance with the specifications set forth herein. This Invitation to Bid (ITB) and all activities leading toward the anticipated issuance of a Construction Project Agreement between Owner and Contractor are conducted pursuant and subject to Chapters 255, and 287, Florida Statutes (F.S.), and Rule 60D-5, Florida Administrative Code (F.A.C.). This solicitation will be administered through the Vendor Information Portal (VIP). Bidders interested in submitting a bid must comply with all terms and conditions described in this solicitation. It is the intent of the Department to make a single award, or make no award, as determined to be in the best interest of the State. Additive Alternate #1 Shall Include All Work Necessary to Renovate Room 719, Including: Remove Canopy Hoods 719a and 719b, Relocate Fume Hood 719-f, Add New Fume Hood 719-g and Fan, Rebalance Air Flows, New Flooring, Casework, and Ceilings. Additive Alternate #2 Shall Include All Work Necessary to Replace Existing Fume Hoods 722-a and 722-b, and Casework. Additive Alternate #3 Shall Include All Work Necessary to Renovate Room 709, Including: New Flooring, Casework, Ceilings, Snorkel Exhaust. Additive Alternate #4 Shall Include All Work Necessary to Replace Existing Fan F-7- 19, Above Fume Hood 719-c. Contractor Shall Refer to and Complete All Work in Accordance With the Program Scope of Work Narrative and Technical Specifications for Detailed Scope of Work Requirements and Offer Complete Pricing, Including Base Bid. All Work Shall Be in Accordance With Florida Building Code and Manufacturer's Instructions. Contractor Shall Obtain All Necessary Permits Including Any Other Drawings, Design, or Engineering Which May Be Needed for Those Permits, for a Complete Project. Contractor Shall Provide All Written, Fully Executed Warranties and Close-out Documentation at Project Completion. Question Deadline 05/21/2025 at 5:00 PM ET Location : Florida Department of Agriculture and Consumer Services Email: Bids@FDACS.gov . Anticipated Posting of Written Responses to Bidders Inquiries location : online. Construction shall be substantially complete within 180 calendar days after issuance of the Notice to Proceed. The contract period shall be a total of 210 calendar days, which shall consist of 180 calendar days to substantial completion of work after issuance of the Notice to Proceed and 30 calendar days beyond substantial completion to complete the project close-out process. The time for completion of the work includes, without limitation, obtaining any required permits not obtained by the Department, and other governmental and quasi-governmental approvals, acquiring bonds and interim and final inspections. TIME IS OF THE ESSENCE WITH RESPECT TO THE COMPLETION OF THE WORK. Question Deadline: 05/22/2025 at 3:00 PM ET
Post-Bid
Water / Sewer
$100,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 27, 2025
June 26, 2025
174 Storrs Rd, Mansfield Center, CT
Related To This Project
Mansfield Center, CT
Bid Date: May 08 2019
Mansfield Center, CT
Bid Date: Sep 18 2025
Mansfield Center, CT
Bid Date: Sep 18 2025
Mansfield Center, CT
Bid Date: Apr 21 2025
Mansfield Center, CT
Bid Date: May 07 2025
Mansfield Center, CT
--
Mansfield Center, CT
--
Mansfield Center, CT
Bid Date: Dec 04 2024
Mansfield Center, CT
Bid Date: Apr 09 2025
Mansfield Center, CT
Bid Date: Apr 13 2021
Mansfield Center, CT
Bid Date: Apr 29 2024
Mansfield Center, CT
Bid Date: May 13 2024
Mansfield Center, CT
Bid Date: Mar 27 2024
Mansfield Center, CT
Bid Date: Mar 04 2024
Mansfield Center, CT
Bid Date: Dec 04 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
