Published June 10, 2025 at 8:00 PM

Updated June 11, 2025

Site work and paving for a mixed-use development in Spokane, Washington. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

This project consists of the construction of approximately 466 linear feet of removing existing curb, 250 square yards of removing cement concrete sidewalk and driveway, 300 linear feet of ductile iron storm sewer, 14 each connect 8 inch dia. pipe to existing catch basin, drywell or manhole, 3,500 square yards of pavement repair, 3,900 linear foot inch of sawcutting flexible pavement, 665 linear foot inch of sawcutting rigid pavement, 12,oo0 linear feet of crack sealing, 14,750 square yards of planing bituminous pavement, 27,900 square yards of HMA Cl. 1/2 inch for pavement 2 inch thick, 900 linear feet of cement concrete curb, 253 square feet of cement concrete sidewalk, 17 each retrofit surface inlet, 21 each manhole/drywell cover, 39 each cleaning existing drainage structure, permanent signing, sundry utility adjustments, and other related miscellaneous items. Cashier's check, a certified check or surety bond in the sum of five percent (5%) of the Total Project Bid must accompany the copy of the bid filed with the City Clerk. Successful bidder shall execute the Contract within TEN (10) calendar days after receiving the Contract. Should the successful bidder fail to enter into such contract and furnish satisfactory performance bond within the time stated herein, the bid proposal deposit shall be forfeited to the City of Spokane. The City of Spokane will normally award this Contract or reject bids within FORTY-FIVE (45) calendar days after the time set for the bid opening. If the lowest responsible Bidder and the City of Spokane agree, this deadline may be extended. If they cannot agree on an extension by the 45-calendar day deadline, the City of Spokane reserves the right to Award the Contract to the next lowest responsible Bidder or reject all Bids. Estimate Low:$1,400,000 Estimate High:$1,700,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. questions concerning these Contract Provisions shall be referred to: Mark Melnick, PE at City of Spokane, Department of Engineering Services (509) 625-7774 or email at mmelnick@spokanecity.org.

Post-Bid

Roads / Highways

$1,700,000.00

Public - City

Paving, Site Work

17

16

4

3

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
43
Active Projects
22
Bidding Soon
319
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 2, 2025

August 1, 2025

Project location map

Multiple Locations, Spokane, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.