BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 21, 2025 at 8:00 PM

Updated July 22, 2025

Site work for a road / highway in Garden City, Kansas. Completed plans call for site work for a road / highway.

**As of July 21 , 2025 , This project has been awarded to Dreiling Construction, awarded amount not available.** ** Description: The City of Garden City Electric Department is soliciting bids for underground conduit installation for our Grid Resilience Grant Funding Project. The work consists of installing underground conduits in various locations throughout the City of Garden City. No bidder may withdraw his bid for at least thirty (30) days after the scheduled time for the receipt of bids. The City reserves the right to reject any or all bids, waive informalities, and accept the bid deemed to be in the best interest of the City. The project consists of adding an underground conduit in areas of existing electric infrastructure in the established Right of Way (ROW). Several existing utilities use these ROWs for their infrastructure, and spotting these is to be considered critical to the conduit installation. Per the project specifications, the conduit is installed normally in the range of 48"-60" deep per project specifications. There may be instances when the conduit is installed at a greater depth. Exposure to energized electrical infrastructure will be kept to a minimum for Contractor's Employees by City Electric Department Personnel. All Contractors and Employees involved with the construction are required to attend a formal one-time yearly safety training by the City Electric Department before work commences. The contractor is responsible for all Employee PPE. The contractor is responsible for all One-Call location requests and follows proper spotting of buried infrastructure. Please include existing underground utility exposure in the per-unit bid to offset that exposure cost. There are approximately 28,143 feet of 2" and 937 feet of 6" conduit in the project for installation, based on the cost of 'per foot/unit' installation (See Exhibits A-G for areas of installation). There are approximately 160 existing transformer locations where the conduit will be installed at or nearby affecting 790 customers. All conduit and fittings are owner-furnished.

Award

Roads / Highways

$239,000.00

Public - City

Site Work

9

4

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
19
Active Projects
15
Bidding Soon
83
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 3, 2025

September 8, 2025

Project location map

Multiple Locations, Garden City, KS

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.