Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 4, 2025 at 8:00 PM
Updated August 5, 2025
Site work and paving for a sidewalk / parking lot in Allen Park, Michigan. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.
**As of August 04, 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** Project has been Rebid. o Approx. 750 Lineal Feet Horizontal Curb Cutting; o Approx. 1,000 Lineal Feet Curb and Gutter Transition; o Approx. 4,500 Sft - Remove and Replace Sidewalk Ramps, 6-inch thick, 4,000 PSI; o Approx. 50 ADA, Inserted; o Misc. 5 structure covers adjustment (utilizing EJ Above-Ground Adjustment Riser); o Traffic Maintenance and Control, Restoration, Clean-up; o All other related work. Each bid proposal shall be accompanied by a Bid bond, certified check, cashier's check, or money order, executed by the Bidder and Surety firm, licensed to perform business in the State of Michigan, and payable to the City of Allen Park in the amount of Five Percent (5%) of the accompanying bid. Proposal guarantee shall provide assurance the Bidder will, upon acceptance of the bid, execute the necessary Contract with the City of Allen Park. The successful Bidder shall be required to furnish separate Performance, Labor and Material, and Payment Bonds, each in the amount of one-hundred percent (100%) of the Contract amount. No bid shall be withdrawn for a period of sixty (60) days following the date set for receipt, during which time all bids shall remain in full force and effect. Proposals submitted after the exact time specified for receipt shall not be considered, and proposals submitted by telephone, facsimile, or e-mail shall not be accepted. All inquiries shall be directed to C.E. Raines Company at telephone at 734-285-7510. The City of Allen Park reserves the right to accept or reject any or all proposals, waive any irregularity in any proposal, and make an award of Contract in any manner, deemed in its best interest. Proposals submitted after the exact time specified for receipt shall not be considered. Pre bid meeting description: ENGINEER shall transmit to all such Bidders of record such addenda as ENGINEER considers necessary to provide clarification, in response to questions arising therein, or arising subsequent. Oral statements shall not be relied upon and shall not be considered as legally effective or binding. Construction shall start on or before August 1st 2025 ; The Work shall be substantially completed, on or before October 31, 2025 ; Final completion-November 15, 2025 Question deadline - 21 July 2025 Questions received less than ten days prior to the date for opening of Bids may not be answered All questions about the meaning or intent of the Bidding Documents are to be submitted to ENGINEER in writing
Bid Results
Sidewalks / Parking Lot
$110,250.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 31, 2025
September 1, 2025
Multiple Locations, Allen Park, MI
Related To This Project
Allen Park, MI
Bid Date: Jul 02 2025
Allen Park, MI
Bid Date: Jul 02 2025
Allen Park, MI
Bid Date: Jul 11 2025
Allen Park, MI
Bid Date: Jul 30 2025
Allen Park, MI
Bid Date: Aug 26 2025
Allen Park, MI
Bid Date: Sep 30 2025
Allen Park, MI
Bid Date: Sep 30 2025
Allen Park, MI
Bid Date: Oct 20 2025
Allen Park, MI
Bid Date: May 06 2025
Allen Park, MI
Bid Date: May 22 2025
Allen Park, MI
Bid Date: Apr 09 2025
Allen Park, MI
Bid Date: Mar 07 2025
Allen Park, MI
Bid Date: Feb 20 2025
Allen Park, MI
Bid Date: Jan 31 2025
Allen Park, MI
Bid Date: Jan 31 2025
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
