Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 18, 2025 at 8:00 PM
Updated July 19, 2025
Renovation of an educational facility in Russellville, Arkansas. Completed plans call for the renovation of a educational facility.
Bids for removal and replacement of gymnasium rubber flooring at Sequoyah Elementary The selected contractor will be responsible for the following tasks: 1. Removal of Existing Flooring Area: Approximately 4,428 square feet of gymnasium flooring. Work to be performed: Remove existing rubber flooring or any other flooring system currently installed. Properly dispose of all removed materials in accordance with local and state regulations. 2. Surface Preparation Prepare the concrete subfloor for the installation of the new rubber flooring. Ensure the floor is level, clean, dry, and free from debris or contaminants that could affect the installation of the new flooring. Any necessary repairs or floor leveling should be included in the proposal. 3. Installation of New Rubber Flooring Flooring System: The new floor system must be Advanced TBD-8R Mondo Flooring System or an equivalent product. The flooring must be designed for gymnasium use, providing proper traction, durability, and shock absorption for high-impact sports activities. The flooring must meet all safety and performance standards required for gymnasium environments, including but not limited to slip resistance and appropriate cushioning. Installation must be performed in compliance with the manufacturers recommendations and industry standards for commercial gymnasium floors. 4. Edge Treatments and Transitions Properly install edge treatments and transitions where the gymnasium flooring meets other surfaces, ensuring a smooth and safe transition. 5. Post-Installation Clean-Up After the installation, the contractor is responsible for cleaning the area, removing all waste materials, and leaving the gymnasium floor in a clean, safe, and usable condition. Provide instructions for the care and maintenance of the new flooring. For any questions or clarifications regarding this RFP, please contact Chris Campbell, Facilities Director, chris.campbell@rsdk12.net, 479-968-1650
Award
Educational
$42,859.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 26, 2025
June 9, 2025
1601 W 12th St, Russellville, AR
Related To This Project
Russellville, AR
Bid Date: Jun 05 2025
Russellville, AR
Bid Date: Jun 18 2025
Russellville, AR
Bid Date: Jul 02 2025
Russellville, AR
Bid Date: Jun 06 2025
Russellville, AR
Bid Date: Jul 24 2025
Russellville, AR
Bid Date: Jun 30 2025
Russellville, AR
Bid Date: Aug 13 2025
Russellville, AR
Bid Date: Jul 30 2025
Russellville, AR
Bid Date: May 27 2025
Russellville, AR
Bid Date: May 20 2025
Russellville, AR
Bid Date: May 20 2025
Russellville, AR
Bid Date: May 14 2025
Russellville, AR
Bid Date: May 27 2025
Russellville, AR
Bid Date: May 13 2025
Russellville, AR
Bid Date: May 20 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
