BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 18, 2025 at 8:00 PM

Updated July 19, 2025

Renovation of an educational facility in Russellville, Arkansas. Completed plans call for the renovation of a educational facility.

Bids for removal and replacement of gymnasium rubber flooring at Sequoyah Elementary The selected contractor will be responsible for the following tasks: 1. Removal of Existing Flooring Area: Approximately 4,428 square feet of gymnasium flooring. Work to be performed: Remove existing rubber flooring or any other flooring system currently installed. Properly dispose of all removed materials in accordance with local and state regulations. 2. Surface Preparation Prepare the concrete subfloor for the installation of the new rubber flooring. Ensure the floor is level, clean, dry, and free from debris or contaminants that could affect the installation of the new flooring. Any necessary repairs or floor leveling should be included in the proposal. 3. Installation of New Rubber Flooring Flooring System: The new floor system must be Advanced TBD-8R Mondo Flooring System or an equivalent product. The flooring must be designed for gymnasium use, providing proper traction, durability, and shock absorption for high-impact sports activities. The flooring must meet all safety and performance standards required for gymnasium environments, including but not limited to slip resistance and appropriate cushioning. Installation must be performed in compliance with the manufacturers recommendations and industry standards for commercial gymnasium floors. 4. Edge Treatments and Transitions Properly install edge treatments and transitions where the gymnasium flooring meets other surfaces, ensuring a smooth and safe transition. 5. Post-Installation Clean-Up After the installation, the contractor is responsible for cleaning the area, removing all waste materials, and leaving the gymnasium floor in a clean, safe, and usable condition. Provide instructions for the care and maintenance of the new flooring. For any questions or clarifications regarding this RFP, please contact Chris Campbell, Facilities Director, chris.campbell@rsdk12.net, 479-968-1650

Award

Educational

$42,859.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
85
Active Projects
29
Bidding Soon
610
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 26, 2025

June 9, 2025

Project location map

1601 W 12th St, Russellville, AR

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.