BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 16, 2025 at 8:00 PM

Updated July 17, 2025

Site work and renovation of a civil project in Belton, Texas. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

**As of July 16, 2025, this project has not yet been awarded.The project is expected to be awarded next week.** The deadline to ask questions is 5/27/2025 3:00 PM CDT This Package 1a is for the Pre-procurement and delivery of Plant 1 & 2 Sludge Collector Mechanisms only. In order to complete Plant 2 work within the first allowable shut-down schedule, it is imperative that Plant 2's mechanisms are on site no later than March 3, 2026. A general description of the full project scope is below. Construct maintenance improvements to the Lake Belton WTP Plants 1, 2 and 4; and expand Lake Belton WTP at Plant 3 to reach a 102.5 MGD firm capacity. Based on commitments from the Board, the following scope is included in this project: Full Plant Maintenance Scope: Plant 1 Improvements o Flocculation Basin Baffle Wall Replacement (remove redwood baffles and install ported concrete walls) o Sludge Collector Replacement Plant 1 and 2 o Filter Backwash Blower Replacement o Chlorine Scrubber Installation o Replacement of the existing LAS Tanks and structural/architectural improvements to provide a fabric canopy over the bulk storage area. o Upgrades of the Sludge Pump Station Plant 2 Improvements o Sludge Collector Replacement Plant 4 Maintenance Improvements o Replacement of the existing LAS Tanks and structural/architectural improvements to provide a fabric canopy over the bulk storage area. o 48-inch Gate Valve Improvement Plant 3 Expansion Capacity Scope: o Replace three existing raw water pumps with larger Raw Water Pumps and VFD improvements in an existing Electrical Building. o Demolition of the Plant 3 Clarifiers and construction of conventional rapid mix, flocculation, and sedimentation (with circular sludge collectors) basins. Plant 3 Electrical Upgrades Plant 3 Chemical Storage and Chemical Feed Improvements: o Replacement of the existing LAS Tanks and structural/architectural improvements to provide a fabric canopy over the bulk storage area. o Installation of a new electrical duct bank and feeders from the old substation to the raw water electrical building. o Miscellaneous Site and Yard Piping Improvements associated with the above-described scope. If funding is available, the Owner would also like to include: . Combined Gas Chlorine Facility for the site with dry chlorine scrubbers

Post-Bid

Water / Sewer

$900,000.00

Public - County

Renovation, Site Work

5

14

6

Subscribe For Documents

43 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
257
Active Projects
103
Bidding Soon
2,135
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 3, 2025

July 3, 2025

Project location map

Multiple Locations, Belton, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.