Published July 31, 2025 at 8:00 PM
Updated September 25, 2025
Site work for a water / sewer project in Belton, Texas. Completed plans call for site work for a water / sewer project.
Package 1b is for the Procurement of 4 Replacement VFDs only. Existing infrastructure needs to be replaced as soon as possible. A general description of the remainder of the project scope is as follows: Construct maintenance improvements to the Lake Belton WTP Plants 1, 2 and 4; and expand Lake Belton WTP at Plant 3 to reach a 102.5 MGD firm capacity. Based on commitments from the Board, the following scope is included in this project: Full Plant Maintenance Scope: Plant 1 Improvements o Flocculation Basin Baffle Wall Replacement (remove redwood baffles and install ported concrete walls) o Sludge Collector Replacement Plant 1 and 2 o Filter Backwash Blower Replacement o Chlorine Scrubber Installation o Replacement of the existing LAS Tanks and structural/architectural improvements to provide a fabric canopy over the bulk storage area. o Upgrades of the Sludge Pump Station Plant 2 Improvements o Sludge Collector Replacement Plant 4 Maintenance Improvements o Replacement of the existing LAS Tanks and structural/architectural improvements to provide a fabric canopy over the bulk storage area. o 48-inch Gate Valve Improvement Plant 3 Expansion Capacity Scope: o Replace three existing raw water pumps with larger Raw Water Pumps and VFD improvements in an existing Electrical Building. o Demolition of the Plant 3 Clarifiers and construction of conventional rapid mix, flocculation, and sedimentation (with circular sludge collectors) basins. Plant 3 Electrical Upgrades Plant 3 Chemical Storage and Chemical Feed Improvements: o Replacement of the existing LAS Tanks and structural/architectural improvements to provide a fabric canopy over the bulk storage area. o Installation of a new electrical duct bank and feeders from the old substation to the raw water electrical building. o Miscellaneous Site and Yard Piping Improvements associated with the above-described scope. If funding is available, the Owner would also like to include: . Combined Gas Chlorine Facility for the site with dry chlorine scrubbers The deadline to ask questions is 6/03/2025 3:00 PM CDT
Award
Water / Sewer
$83,300,000.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 11, 2025
August 11, 2025
Multiple Locations, Belton, TX
Related To This Project
Belton, TX
Bid Date: Jul 01 2025
Belton, TX
Bid Date: Jun 24 2025
Belton, TX
--
Belton, TX
--
Belton, TX
--
Belton, TX
Bid Date: Jul 10 2025
Belton, TX
Bid Date: Jun 26 2025
Belton, TX
Bid Date: Jul 15 2025
Belton, TX
--
Belton, TX
--
Belton, TX
Bid Date: Jun 03 2025
Belton, TX
Bid Date: May 28 2025
Belton, TX
Bid Date: May 16 2025
Belton, TX
Bid Date: Apr 30 2025
Belton, TX
Bid Date: Jun 18 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.