Published June 7, 2025 at 8:00 PM

Updated June 8, 2025

Demolition, site work and new construction of a pre-engineered storage facility in Adair, Iowa. Completed plans call for the demolition of a pre-engineered storage facility; for the construction of a pre-engineered storage facility; and for site work for a pre-engineered storage facility.

The Iowa DOT is seeking competitive bids for the construction of a salt storage building over existing L panels (1200 ton) at the Adair Maintenance Garage located at 300 Hillcrest R2, Adair, IA, as per the attached Plans and Specifications. Project consists of demolition and removal of existing salt storage hoop building, construction of wood pole building consisting of metal panel siding and metal panel roof over existing precast L's. The Iowa DOT bidding process is subject to the procedures and requirements established in Iowa Administrative Code 761--20. Shipping Terms Deliveries shall be F.O.B Destination. Award - Cost and Other Factors It isthe intent of the Iowa DOT to award the contract to the responsible bidder whose submission is the most advantageous to the Iowa DOT, cost and other factors considered. Other factors include, but are not limited to: meeting or exceeding mandatory requirements, proposed staffing, and meeting required time schedule. Other factors may also include a comprehensive review of bidders past work performance, and work capacity.. Communication Until a contract is awarded, the sole point of contact for this bid opportunity will be the Purchasing Agent listed in the event. All questions must be directed solely to the Purchasing Agent and will not be accepted after the Q&A Submissions Close Date. Bidders are strongly encouraged to submit all questions through the Q&A Board. Responses to questions will be posted on the Q&A Board. Contract Term DOT estimated start date on or after July 2, 2025 DOT Substantial Completion date: 115 Days from Notice to Proceed Announcement. DOT Responsibility-Inspection and Supervision • All work shall be according to the approved design and shall be under the direct supervision of the Iowa DOT. • Periodic site inspections will be carried on by the Iowa DOT with the Contractor to ensure coordination of the project. • The Iowa DOT will provide a list of items requiring inspection prior to or during installation. The Contractor is to give the Iowa DOT notice no less than 24 hours in advance of installation. • The Iowa DOT point of contact after the contract award shall be determined. Payment and Completion of Contract Description Payments on contract will be made monthly by means of state warrants to the extent of Ninety-Five Percent (95%) of the value of work performed, including acceptable material stored at the building site, as determined by the Contractor as governed by the Iowa DOT.

Award

Warehouse / Distribution - Pre-Engineered Storage Building

$158,226.00

Public - State/Provincial

Demolition, New Construction, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
167
Active Projects
122
Bidding Soon
1,301
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 29, 2025

June 30, 2025

Project location map

300 Hillcrest R2, Adair, IA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.