BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 28, 2026 at 8:00 PM

Updated May 29, 2026

Site work and paving for a mixed-use development in Baker City, Oregon. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; bridge / tunnel; bridge / tunnel; road / highway; road / highway; and water / sewer project.

Region 5 Eastern Oregon 2024-2027 ADA Curb Ramps, Phase 3 Project Various Highways Bryan Strasser, RE Various Counties: Eastern Oregon 2024-2027 Ada Curb Ramps, Phase 3 Project on Various Highways From Wallowa to Baker City. Fap No. Sa00(851). ($ 2,000,000 - $ 5,000,000). Req. Approx. 3,580 Ft2 Temp Sign; 4 Ea Pcms; 400 HR Flag; 400 HR Flag Sta Light; 2,000 Ft Pcd; 120 Ea Temp Curb Ramp; 119 Ea Inlet Protect; 1,553 Ton Contam Soil Disp; 13 Ea Soil Sample; Const Surv Work; 6,401 Yd2 Rem Surf for Curb Ramp; 8,784 Ft Sawcut; 1,650 Ft Vid Insp; 846 Ft Pipe; 157 Ft Trench Drain; 31 Ea Conc Structure; 93 Ea Adjust Structure; 599 Yd2 Cppr; 3,051 Ton Aggr BASE; 5 Yd3 Aggr Cover; 312 Ton Acp; 630 Yd2 Conc Pvmt; 5,400 Ft Conc Curb; 41,514 Ft2 Conc Surface; 192 Ft2 Salvage and Reinstall Paver; 1,883 Ft2 Trunc Dome; 8 Ea Crosswalk Closure; 960 Fbm Wood Sign Supp; 2,583 Lb Sign Supp; 421 Ft2 Sign; Refurb and Reinstall Illum Sys; Traff Sig Mod; 15 Yd3 Topsoil; 6 Yd3 Soil Conditioner; 547 Yd2 Sod; 87 Yd3 Rock Mulch; Irrigation Sys. Completion Time: September 30, 2027. Classes of Work: A) Earthwork and Drainage, or B) Miscellaneous Highway Appurtenances. This Project Contains Fuel Escalation Clause. This Project Contains a 15% Indian Employment Preference Goal. Project Manager: Bryan Strasser, Email: Bryan.e.strasser@odot.oregon.gov The Oregon Department of Transportation is an Equal Employment Opportunity and Affirmative Action Employer. The policy of the Oregon Department of Transportation is to provide equal opportunity for participation in its contracting activities to all persons and firms in compliance with applicable Federal and State laws, rules and regulations. The Department of Transportation may reject any bid not in compliance with all prescribed public bidding procedures and requirements, and may reject for good cause any or all bids upon a finding of the Department of Transportation that it is in the public interest to do so. To be eligible for award of Oregon Department of Transportation construction contracts, bidders (prime contractors) must submit a prequalification application according to ODOT's Oregon Administrative Rules and prequalification procedures at least ten calendar days before the Bid Closing date. Prequalification must be in the class(es) of work indicated in the project's special provisions, and the bid booklet. ORDOT - 003 - Eastern Oregon 2024-2027 ADA Curb Ramps, Phase 3 Project *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

GC Bidding

Sidewalks / Parking Lot

$5,000,000.00

Public - State/Provincial

Paving, Site Work

346

8

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
15
Active Projects
5
Bidding Soon
137
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 11, 2026

August 10, 2026

Project location map

Multiple Locations, Baker City, OR

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.