BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 4, 2025 at 8:00 PM

Updated July 22, 2025

Site work, paving and outdoor lighting for a mixed-use development in Eastpoint, Florida. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; and bridge / tunnel.

Counties: Franklin Road Name: SR 30 (US 98 / US 319) Limits: From S of Franklin St to Carrabelle River Bridge Project(s): 44576115201(*) Federal Aid No: D322069B Project(s): 44576115202 Federal Aid No: D322069B Project(s): 44576115203 Federal Aid No: D322069B Total Roadway Length: 15.247 Miles Total Bridge Length: 0.034 Miles Total Proposal Length: 15.281 Miles Contract Days: 610 Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 120 Days Please read the full advertisement Description: The Improvements under this Contract consist of (FPID: 445761-1-52-01) Milling and Resurfacing of SR 30 (US 98/319) from S. Franklin Street to the Carrabelle River Bridge. Other improvements include sections of roadway reconstruction, sidewalk construction, paved shoulder construction, guardrail improvements, cross slope correction, and resurfacing of the shared use path near Carrabelle Beach Park. This project will also receive upgrades to signing and pavement markings along SR 30 (US 98/319) and on the Carrabelle River Bridge. (FPID: 445761-1-52-02) consists of Signing and Pavement Marking Safety Improvements within the project limits. (FPID: 445761-1-52-03) consists of replacing two box culverts with bridge culverts: BR 490038 (MP 170112) and BR 490039 (MP 18.005) and will require the use of temporary signals as part of the staged construction. Other improvements include the addition of Articulated Concrete Block (ACB) along the project limits where none currently exist and multiple cross drain replacements. All work is to be done in Franklin County. Question Deadline 06/04/2025 at 5:00 PM ET, Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 002 - Resurfacing - SR 30

Award

Roads / Highways

$14,957,494.00

Public - State/Provincial

Outdoor Lighting, Paving, Site Work

286

7

7

Subscribe For Documents

47 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
70
Active Projects
12
Bidding Soon
459
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 11, 2025

August 11, 2025

Project location map

FL-30, Eastpoint, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.