Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 15, 2025 at 8:00 PM
Updated June 11, 2025
This is a service / maintenance or supply contract in Covington, Georgia. Contact the soliciting agency for additional information.
The City seeks to enter into an on-demand service contract for providing all labor, tools, skills, equipment and all incidental materials not supplied by the city for the construction of 2'' and 4-inch steel and polyethylene gas main and services within the natural gas service territory of the City of Covington Georgia. Question Deadline 06/03/2025 Oral interpretations of the meaning of plans, specifications or other contract documents shall not be binding over written material. Every request for such interpretation should be emailed to econder@segasengineering.com or submitted in writing addressed to Southeastern Gas Engineering, P.O. Box 20191, Atlanta, GA 30325 and to be given consideration must be received at least five business days prior to the date fixed for the opening of bids. The successful bidder, upon his failure or refusal to execute and deliver the contract and bonds required within 10 days after he has received notice of the acceptance of his bid, shall forfeit to the Owner, as liquidated damages for such failure or refusal, the security deposited with his bid. Each bid must be accompanied by a certified check or bid bond prepared on the form of bid bond attached hereto, duly executed by the bidder as principal and having as surety thereon a surety company approved by the Owner, in the amount of 5% of the bid. Such certified checks or bid bonds will be returned to all except the three lowest bidders within three days after the opening of bids, and the remaining certified checks or bid bonds will be returned promptly after the Owner and the accepted bidder have executed the contracts, or, if no award has been made within 60 days after the date of the opening of bids, upon demand of the bidder at any time thereafter, so long as he has not been notified of the acceptance of his bid. The Owner may consider informal any bid not prepared and submitted in accordance with the provisions hereof and may waive any informalities to reject any and all bids. Any bid may be withdrawn prior to the above scheduled time for opening of bids or authorized postponement thereof. Any bid received after the time and date specified shall not be considered. No bidder may withdraw a bid within 90 days after the actual date of the opening thereof.
Post-Bid
Pipeline
Public - City
Service, Maintenance and Supply
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 10, 2025
July 10, 2025
Multiple Locations, Covington, GA
Related To This Project
Covington, GA
Bid Date: Jun 10 2025
Covington, GA
--
Covington, GA
Bid Date: Jun 12 2025
Covington, GA
Bid Date: Jun 24 2025
Covington, GA
--
Covington, GA
Bid Date: Aug 14 2025
Covington, GA
Bid Date: May 29 2025
Covington, GA
Bid Date: May 20 2025
Covington, GA
--
Covington, GA
Bid Date: Jun 03 2025
Covington, GA
Bid Date: Jun 05 2025
Covington, GA
Bid Date: May 22 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
