BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 12, 2025 at 8:00 PM

Updated August 13, 2025

Renovation of a municipal facility in Las Vegas, Nevada. Completed plans call for the renovation of a municipal facility.

Question Cut Off Date 5/27/2025 12:00:00 PM (PT) Questions regarding this bid must be directed to the Bid Contact listed in this bid. Construction includes all administrative work as outlined in the Division 01 General Requirements and the following noted on Drawings and Specifications: Demolition of the lighting control equipment including existing lighting control devices and existing lighting control cabling. Existing relay panels within the scope of work and existing relays in relay panels shall remain. Existing override zone switches shall be disconnected and remain in place. Demolition of the lighting control panels and associated supporting cables and power accessories. Existing lighting fixtures connected to the lighting control relay panel will remain on/off as currently programmed during renovation; lighting to remain operational in all work areas. Installation of new lighting control devices, lighting control cabling, associated supporting cables and power accessories throughout the buildings. Existing override zone switches shall be re-labelled and provide new relay connections. Contractor to commission and program the lighting analytics system. Each override zone will have an interim program to adjust light level as needed to user/owner recommended level. After work is completed to a level where programming the override zone is ready, the final light level will be programmed with automation (on/off based on sensor and timeclock, and dimming based on daylight sensor if one is included). Power connections for a complete system including conduit, boxes, and conductors to support the new equipment. Repairing and painting/patching of all ceilings and walls, and replacement of damaged ceiling tiles shall be completed to repair the existing spaces back to their original condition. Material storage shall be limited to onsite storage containers, provided by the contractor, and coordinated with the RPM D&C. Entire space shall be clean, including floors, ceilings, and desks. All openings in walls and ceilings shall be properly sealed and safe for occupants. All contractor construction equipment and devices shall not be stored in any space not approved by County Representatives. ESTIMATED COST: $2,296,150 - $2,537,850. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Municipal

$858,749.00

Public - County

Renovation

30

18

7

3

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
53
Active Projects
10
Bidding Soon
424
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 10, 2025

August 11, 2025

Project location map

500 S Grand Central Pkwy, Las Vegas, NV


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.