BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 17, 2025 at 8:00 PM

Updated November 20, 2025

Site work and new construction of a mixed-use development in Queen Creek, Arizona. Completed plans call for the construction of a fire / police facility; for site work for a fire / police facility; and parking garage.

Project Summary: It is the Town of Queen Creek's intent to enter into a preconstruction services and construction services contract with a qualified construction manager/general contractor to construct a new headquarters and secure parking structure for the Town of Queen Creek Police Department (QCPD). The location of the existing property site is located just south of the Town of Queen Creek Municipal Services Building (MSB) at 22358 S. Ellsworth Rd, Queen Creek, AZ 85142, between the MSB and Crewse Lane, replacing the existing Pocket Park for Pups and Town of Queen Creek Recycling Center. The overall development site spans approximately 3.6 acres and is surrounded by active business operations. Existing amenities such as the Pocket Park for Pups and the Queen Creek Recycling Center are in the process of being relocated and will be completely vacated by the end of calendar year 2025. Due to space constraints, and in an effort to minimize municipal infrastructure, the project design will consist of one main structure that incorporates both the QCPD Headquarters operations and QCPD secure parking. The approximate combined square footage of the entire structure is scheduled to be approximately no more than ~270,000 square feet; 65,000 to 70,000 square feet for the actual headquarters portion of the structure and 180,000 to 200,000 square feet for the secure parking structure portion. Other site amenities include modifications to at least one retention basin, construction of new surface parking, landscape improvements, minor street modifications and site demolition of existing amenities, including one restroom and storage structure currently occupying the site. The Town is currently under contract with Arrington Watkins Architects for design of this project and has started master planning of the site and conceptual design of the structure, therefore the successful CMAR Contractor will be working closely with Arrington Watkins Architects and the Town to assist with design and to construct this facility. A comprehensive evaluation and master planning effort of the QCPD current and future operations was completed in June 2024 to assess and determine the needs of QCPD for the next ten years and this project is Public Safety Complex #2 of potentially four for the total buildout of QCPD. Question Deadline 05/23/2025 at 5:00 PM MT Any question related to this Request for Qualifications (RFQ) shall be via the Town of Queen Creek e-Procurement Portal.

Award

Fire / Police

$37,500,000.00

Public - City

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

12

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
34
Active Projects
2
Bidding Soon
753
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 5, 2025

February 5, 2026

Project location map

20727 Civic Pkwy, Queen Creek, AZ

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.