Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 8, 2025 at 8:00 PM
Updated August 9, 2025
Renovation of a mixed-use development in St Jean Baptiste, Manitoba. Completed plans call for the renovation of a educational facility.
1 All electrical work shall be conducted in accordance with applicable codes and standards. All electrical work shall be performed by qualified workmen. 2 Isolate all electrical and mechanical roof-top unit service lines within their own waterproofing doghouse curbs. Roof top unit service lines are to exit the vertical faces of curbs a minimum 200mm above the finished height of the new primary roof membrane. 3 The Province and Consultant are to be notified immediately if electrical conditions are found that do not meet applicable local, provincial or national standards or industry. .4 Install new C-port CE-Extension rubber equipment/service line supports complete with new Unistrut stands under all new and existing roof top service lines, cable trays and raised ductwork on new loose-laid SBS modified bitumen cap sheet protection pads. 5 Closely coordinate the temporary removal of all parapet wall-mounted equipment, conduit, junction boxes, lightning protection etc., with the Province to allow for the installation of the new roof assembly components. Note this is extremely sensitive equipment that must be in service at all times. Reinstall electrical components after installation of new roof assembly components are complete. 6 Lightning protection equipment is to be temporarily removed and reinstalled by a qualified person. The Province will request verification of qualification. It is recommended a sub-contractor be included during the pre-tender meeting to verify existing conditions and scope. 7 All electrical components shall be disconnected and reconnected in accordance with the current Canadian Electrical Code. A performance bond of a company registered to conduct the business of a surety in Manitoba, in the form attached to the tender documents, in the amount of fifty percent (50%); of the Contract Price; and A labour and materials payment bond of a company registered to conduct the business of surety in Manitoba, in the form attached to the tender documents, in the amount of fifty percent (50%) of the Contract Price. Question Acceptance Deadline: 2025/05/19 04:00:00 PM CDT Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.
Post-Bid
Educational
$300,000.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 11, 2025
June 30, 2025
113 2nd Ave SW, St Jean Baptiste, MB
Related To This Project
St Jean Baptiste, MB
Bid Date: Jan 07 2026
St Jean Baptiste, MB
Bid Date: Jan 16 2026
St Jean Baptiste, MB
Bid Date: Jan 08 2025
St Jean Baptiste, MB
Bid Date: Jan 10 2024
St Jean Baptiste, MB
Bid Date: Jul 07 2023
St Jean Baptiste, MB
Bid Date: Feb 09 2023
Winnipeg, MB
Bid Date: Jun 12 2025
Solsgirth, MB
Bid Date: May 27 2025
Leaf Rapids, MB
Bid Date: Jul 25 2025
Brandon, MB
Bid Date: May 16 2025
Winnipeg, MB
Bid Date: May 29 2025
Gimli, MB
Bid Date: May 23 2025
Riverton, MB
Bid Date: May 13 2025
Brandon, MB
Bid Date: May 13 2025
Winnipeg, MB
--
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
