BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 19, 2025 at 8:00 PM

Updated September 20, 2025

Site work and paving for a road / highway in Sauget, Illinois. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Reconstruct the northwest corner of IL 3 at Monsanto Avenue, and resurface Monsanto Avenue from IL 3 east for 0.04 miles in Sauget. Region 5 District 8 Federal Project # YHU4(842) County(s) St. Clair Key Route(s) FAP 312 Marked Route(s) IL 3 Section(s) 16-00015-01-PV (Sauget) State Job #(s) C-98-338-16 PPS #(s) 8-11025-0012 Contract Specifics 40 Working Days Questions not accepted as of July 22, 2025 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashiers check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared "not responsive," it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractor's Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, July 11, 2025. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. LOCATION OF WORK The project is located within the municipal limits of the Village of Sauget, Illinois, and is at the 4-way intersection of Monsanto Avenue (aka FAU 9194) and IL Rte. 3 (aka Mississippi Ave., aka FAP 312). For reference purposes, the 4-way intersection will consist of Monsanto Ave. (east and west leg), and IL Rte. 3 (north and south leg). The physical improvements to the roadway are generally confined to the eastern leg, and extend from the east edge of the northbound, traveled pavement of IL Rte. 3, eastwardly on Monsanto Ave. for approximately 208 feet. Improvements on the other legs of the intersection are generally limited to pavement striping. DESCRIPTION OF WORK The proposed improvements consist of furnishing all labor, equipment and materials necessary to construct the following: The intersection improvements include, but are not limited to, the milling of the existing asphalt pavement on the east leg of the intersection to allow for the placement of a new asphalt surface course. The island in the southeast quadrant of the intersection will be removed, and the existing traffic signal from that island will be relocated to a point behind the existing curb on the existing rounding. The existing island in the northeast quadrant will be reshaped slightly to allow for improved vehicular movements. The existing shoulder on the northeast corner will be extended northwardly to provide for improved pedestrian access to the newly constructed bus stop immediately north of the northeast corner of the intersection. Two curb inlets along Monsanto Ave. will receive new inlet stones (tops), and approximately 214 lineal feet of concrete curb and gutter along the northeast rounding will be removed and replaced. New pavement markings will be placed on all four legs of the intersection. The proposed improvements require traffic control, erosion control, signage, and all other miscellaneous items necessary to complete the proposed improvements in 40 working days, all as shown on the plans. ILDOT - 084 - Reconstruct the Northwest Corner of IL 3 at Monsanto Avenue, and Resurface Monsanto Avenue

Award

Roads / Highways

$607,366.00

Public - State/Provincial

Paving, Site Work

24

6

2

5

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
200
Active Projects
99
Bidding Soon
1,313
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 1, 2025

September 30, 2025

Project location map

IL-3 & Monsanto Ave, Sauget, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.