Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 16, 2025 at 8:00 PM
Updated July 17, 2025
Renovation of a mixed-use development in Colorado Springs, Colorado. Completed plans call for the renovation of a educational facility.
**As of July 16th, 2025, the project was awarded to Encore Electric, but the awarded amount is not available.** Reference Number 0000387068 Bid Intent Not Available Job Location: Various Lighting Upgrades at 31 Locations. he Contractor will be expected to provide specific construction management services as described below: a. Project Control - Monitor the work of the subcontractors and coordinate the work with the activities and responsibilities of the District and Architect/Engineer to complete the project in accordance with the Districts objectives of cost, time and quality. b. Maintain a competent full-time staff at the project site to coordinate and provide general direction of the work and progress of the subcontractors on the project. c. Establish on-site organization and lines of authority in order to carry out the overall plans of the construction team. d. Work with the District to establish procedures for coordination among the District, Architect/Engineer, and subcontractors with respect to all aspects of the project and implement such procedures. e. Attend progress meetings at which subcontractors, District, Architect-Engineer and contractor can discuss jointly such matters as procedures, progress, problems and scheduling. Provide a detailed schedule for the operation of the contractor and subcontractors on the project, including realistic activity sequences and duration's, allocation of labor and materials, processing of shop drawings and samples and delivery of products requiring long lead-time procurements include the District's occupancy requirements showing portions of the project having occupancy priority, if any. f. Provide regular monitoring of the schedule as construction progresses. Identify potential variances between scheduled and probable completion dates. Review schedule for work not started or incomplete and recommend to the District and subcontractors adjustments in the schedule to meet the probable completion date. Provide summary reports of each monitoring and document all changes in schedule. g. Determine the adequacy of the subcontractor's personnel and equipment and the availability of materials and supplies to meet the schedule. h. Cost Control - Develop and monitor an effective system of project cost control, showing actual costs for activities in process and estimates for uncompleted tasks. Revise and refine the initially approved Project Construction Budget, incorporate approved changes as they occur and develop cash flow reports and forecasts as needed. i. Change Orders - Utilize Districts Change Order system. Recommend necessary or desirable changes to the District and the Architect/Engineer, review requests for and submit recommendations to the District and the Architect-Engineer. j. Permits and Fees - Obtain all building permits and special permits for permanent improvements, excluding permits for inspection or temporary facilities required to be obtained Buyer Preferences, Guidelines & Requirements General Requirements - Certification/Training - Employee Background Checks Required - Installation Required - Insurance Required - License Required Bonding Requirements - Performance Bond 100 % - Labor and Materials Bond 100 % Question Deadline 05/28/2025 at 2:00 PM MT Deadline for Emailed Questions to kris.garnhart@asd20.org All questions regarding proposal preparation, the selection process, specifications and interpretations of the terms and conditions of the RFP shall be submitted via email in writing no later than time. Academy District 20 reserves the right to reject any or all offers and to waive informalities and minor irregularities in offers received, and/or to accept any portion of the offer if deemed in the best interest of Academy District 20. Failure of the Offeror to provide in its offer any information requested in the RFP may result in rejection
Award
Educational
$200,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
6
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 4, 2025
July 4, 2025
Multiple Locations, Colorado Springs, CO
Related To This Project
Colorado Springs, CO
Bid Date: Jun 06 2025
Colorado Springs, CO
--
Colorado Springs, CO
Bid Date: Jun 11 2025
Colorado Springs, CO
--
Colorado Springs, CO
Bid Date: Jun 13 2025
Colorado Springs, CO
Bid Date: May 23 2025
Colorado Springs, CO
Bid Date: May 21 2025
Colorado Springs, CO
Bid Date: Sep 21 2020
Colorado Springs, CO
Bid Date: Jun 02 2025
Colorado Springs, CO
Bid Date: May 23 2025
Colorado Springs, CO
Bid Date: May 13 2025
Colorado Springs, CO
Bid Date: May 12 2025
Colorado Springs, CO
Bid Date: Jun 05 2025
Colorado Springs, CO
--
Colorado Springs, CO
Bid Date: Jun 04 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
