BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 18, 2025 at 8:00 PM

Updated July 19, 2025

Site work, paving and outdoor lighting for a mixed-use development in Greeley, Colorado. Completed plans call for site work for a road / highway; for paving for a road / highway; for outdoor lighting for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Reference Number 0000390205 This federally funded project entails roadway and utility improvements at the O Street and 59th Avenue intersection to construct a single-lane roundabout (with ability to widen inwards to a multi-lane roundabout in the future), along with drainage and utility improvements. These improvements include roadway reconstruction and converting the intersection into a roundabout, installing curb and gutter, roadway and ditch grading, raised medians, storm sewer and water quality pond installation, installing water line mains, tunneled railroad crossing for the water line and storm (Bid Alternate 1), landscaping, irrigation, and street lights. All of this work will be in conformance with the City of Greeley Standards and Specifications, the Colorado Department of Transportation "Standard Specifications for Road and Bridge Construction, latest Edition", M & S Standards latest Edition and the Manual on Uniform Traffic Control Devices, latest Edition. The project has an 8.5% DBE participation goal. Question Deadline 07/03/2025 at 11:00 AM MT Questions are submitted online No, Questions pertaining to the project may be directed to purchasing@greeleygov.com Notice of Award (tentative) 7/28/2025 Notice to Proceed (tentative) 9/15/2025 Each bid shall be accompanied, by a certified check drawn on a bank which is insured by the Federal Deposit Insurance corporation or a bidder's bond executed by a surety company authorized to do business in Colorado, made payable to the City of Greeley, Colorado, in an amount not less than five percent (5%) of the proposal sum as security that the successful bidder will enter into a contract to construct this project in accordance with the plans and specifications, and give bonds in the sum as hereafter provided. Checks accompanying bids not accepted will be returned. The successful responsive and responsible bidder will be required to furnish a satisfactory performance bond and payment bond in the amount of the contract sum. No bid shall be withdrawn after the opening on the bids without the consent of the City of Greeley, Colorado, for a period of sixty (60) days after the scheduled time of the receiving the bids. The City of Greeley retains the right to reject any and all bids and to waive any informality as deemed in the best interest of the city.

Bid Results

Roads / Highways

$4,049,592.00

Public - City

Outdoor Lighting, Paving, Site Work

5

10

8

6

Subscribe For Documents

87 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
73
Active Projects
6
Bidding Soon
974
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 17, 2025

September 15, 2025

Project location map

O St & N 59th Ave, Greeley, CO


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.