Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published June 14, 2025 at 8:00 PM
Updated June 15, 2025
Site work and outdoor lighting for a road / highway in Seattle, Washington. Completed plans call for site work for a road / highway; and for outdoor lighting for a road / highway.
PROJECT DESCRIPTION: This Project consists of the following elements of Work: removal of existing lighting system and installation of new LED lighting system, including wiring. Question Submission Deadline:May 29, 2025, 5:00pm All questions on the Inclusion Plan must be directed to Miguel Beltran at Miguel.beltran@seattle.gov or 206-684-4525. For purposes of the Inclusion Plan, this is considered a Streetlight Systems type of project with a Past Performance of 15% WMBE utilization rates based on completed projects Work must begin immediately on the Notice To Proceed Date in the Written Notice from the Engineer, Seattle City Light, and after the date of such notice must be physically completed within the following period per Section 3 of the Agreement: 90 WORKING DAYS If the successful Contractor fails to complete Work within the time set forth above, they must be charged Liquidated Damages per Section 4 of the Agreement Form. If the Work is not Substantially Complete within the Contract Time, the Contractor must pay to the Owner, as Liquidated Damages, the sum of $950.00 for each Working Day that the Work has not achieved Substantial Completion exclusive of those days where the Engineer has granted an extension of time. After Substantial Completion, for each Working Day that the Contractor fails to achieve Physical Completion within the Contract Time, the Contractor must pay to the Owner, as Liquidated Damages, the sum of $475.00 for each Working Day that the Work has not achieved Physical Completion exclusive of those days wherefore the Engineer has granted an extension of time.
Award
Roads / Highways
$621,551.00
Public - City
Outdoor Lighting, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 4, 2025
July 4, 2025
Weedin Pl NE, Seattle, WA
Related To This Project
Seattle, WA
--
Seattle, WA
Bid Date: Jun 02 2025
Seattle, WA
Bid Date: Jun 16 2025
Seattle, WA
Bid Date: Jun 05 2025
Seattle, WA
Bid Date: Jun 20 2025
Seattle, WA
Bid Date: Jan 27 2026
Seattle, WA
Bid Date: Jun 26 2025
Seattle, WA
Bid Date: Jun 13 2025
Seattle, WA
Bid Date: Jun 04 2025
Seattle, WA
Bid Date: Jun 02 2025
Seattle, WA
Bid Date: Jun 06 2025
Seattle, WA
--
Seattle, WA
Bid Date: Jun 06 2025
Seattle, WA
Bid Date: Jun 10 2025
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed