Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 28, 2025 at 8:00 PM
Updated July 29, 2025
Site work and paving for a sidewalk / parking lot in Sedona, Arizona. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.
**As of June 20,2025, this project has not yet been awarded. A timeline for the award has not yet been established.** Questions Due Date: May 30th 2025, 2:00 PM MST All questions should be directed in writing using the City's eProcurement System or to: Ian Coubrough Procurement Officer icoubrough@sedonaaz.gov Construction of the Little Horse Shared Use Path is located along Highway 179 between Indian Cliffs Road and the Little Horse Trailhead. The scope of work for this contract is to construct a shared use pathway and related work. The Engineer's Opinion of Probable Construction Cost is $158,888. CONTRACT TIME: 45 calendar days (including Notice to Proceed date) LIQUIDATED DAMAGES: $430 per day beyond the 45-calendar day Contract Duration. Each bidder's proposal shall be made on forms furnished in the Contract Documents and must be accompanied by a security consisting of a certified check, cashier's check, or bid bond in an amount of not less than ten percent (10%) of the amount of the total bid amount, and made payable to the CITY OF SEDONA, ARIZONA. The successful Bidder will be required to furnish two (2) bonds. One (1) bond, to become effective upon award of the Contract, shall be a Performance Bond substantially in the form attached, and shall be in a sum of one hundred percent (100%) of the contract price including any additions to the Contract. The Bond shall be effective throughout the construction period, including a two (2) year warranty period. The successful Bidder shall also furnish a Labor and Material Payment Bond, substantially in the form attached, to become effective upon award. Said Labor and Material Bond shall be in the amount of one hundred percent (100%) of the Contract price. The successful Bidder will be determined based on the lowest responsive and responsible Proposal. The City of Sedona, Arizona reserves the right to reject any or all Proposals, to waive or not to waive any informalities, or irregularities in the Proposals received, and to accept a Proposal which in its judgment best serves the interests of the City
Award
Sidewalks / Parking Lot
$160,724.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 4, 2025
July 4, 2025
AZ-179, Sedona, AZ
Related To This Project
Sedona, AZ
Bid Date: Nov 07 2025
Sedona, AZ
--
Sedona, AZ
Bid Date: Aug 27 2025
Sedona, AZ
--
Sedona, AZ
Bid Date: Sep 10 2025
Sedona, AZ
Bid Date: Jan 16 2026
Sedona, AZ
Bid Date: Jan 21 2026
Sedona, AZ
Bid Date: Apr 30 2025
Sedona, AZ
Bid Date: Apr 23 2025
Sedona, AZ
Bid Date: Apr 24 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
