Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 21, 2025 at 8:00 PM

Updated August 22, 2025

Site work and paving for a bridge / tunnel in Stratford, Ontario. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

he work under this Contract consists of bridge repairs at five (5) locations within the City of Stratford. Generally, the work involved consists of handrail repairs and concrete patch repairs to bridge elements such as sidewalks, deck edges, wingwalls, and soffits. Site-specific vehicle and pedestrian traffic control measures are required at all locations. All in-water works are to be done between July 15th and March 15th. The Contractor will not be allowed to close any streets without the express written consent of the City. The contract is separated into five (5) project areas of work to be done in 2025 and 2026. Project Area #1: William Hutt Bridge, Waterloo Street (09-BR-2) Project Area #2: John Street Bridge (12-BR-3, required to be completed in 2025). Project Area #3: Lakeside Drive Bridge (07-BR-2) Project Area #4: Douglas Street Bridge (17-BR-3) Project Area #5: Romeo Street Retaining Wall (04-RW-4) Documents can be obtained at: https://stratford.bidsandtenders.ca Question Deadline: Fri Aug 15, 2025 12:00:00 PM (EDT)

Bid Results

Bridges / Tunnels

$689,809.00

Public - City

Paving, Site Work

18

14

2

4

Subscribe For Documents

51 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
243
Active Projects
104
Bidding Soon
2,062
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 20, 2025

September 15, 2025

Project location map

Multiple Locations, Stratford, ON

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed