BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 12, 2025 at 8:00 PM

Updated June 13, 2025

Renovation of a mixed-use development in Pasadena, Texas. Completed plans call for the renovation of a educational facility.

Question Deadline 06/04/2025 at 2:00 PM CT PASADENA INDEPENDENT SCHOOL DISTRICT is soliciting Competitively Sealed Proposal for Nutrition Services Walk-in Cooler and Freezer Systems Replacement. PISD is looking to obtain responses from vendors that can provide Nutrition Services Walk-in Cooler and Freezer Systems Replacement. Initial Contract Period August 1, 2025 - July 31, 2026 Shaw Middle School ITEM NO. 01 - WALK-IN COOLER EVAPORATOR COIL Model No: BEL0105 or Equivalent Quantity: 1 Each Electrical: 115v/1ph Evaporator coils shall be a direct expansion type. Evaporators used will be all "Underwriters Laboratory Listed" supplied from factory with an electronic expansion valve, solenoid valve and Eco-Smart on- demand defrost controller, pre-wired and pre-piped under nitrogen pressure and designed for use with the refrigerant specified. ITEM NO. 02 - WALK-IN FREEZER EVAPORATOR COIL Model No: BEL0155 or Equivalent Quantity: 1 Each Electrical: 208v/1ph Turnkey Installation of the refrigeration rack at Shaw Middle School 1) Turnkey Removal and replacement of walk-in cooler/ freezer refrigeration system (electrical included). 2) Aluminum UV protection for exposed refrigeration lines included in pricing. 3) Turnkey installation of new RDT refrigeration rack, including the disconnect, reconnect, and modifications to the electrical service supplying the rack and evaporator coils. 4) Refrigerant leak detectors if required are by others. 5) Work to be performed at regular time hours 6) Remove old equipment to specified location South Houston High School ITEM NO. 05 - WALK-IN COOLER EVAPORATOR COIL Model No: BEL0155 or Equivalent Quantity: 1 Each Electrical: 115v/1ph Evaporator coils shall be a direct expansion type. Evaporators used will be all "Underwriters Laboratory Listed" supplied from factory with an electronic expansion valve, solenoid valve and Eco-Smart on- demand defrost controller, pre-wired and pre-piped under nitrogen pressure and designed for use with the refrigerant specified. Turnkey Installation of the refrigeration rack at South Houston High School 1) Turnkey Removal and replacement of walk-in cooler/ freezer refrigeration system (electrical included). 2) Aluminum UV protection for exposed refrigeration lines included in pricing. 3) Turnkey installation of new RDT refrigeration rack, including the disconnect, reconnect, and modifications to the electrical service supplying the rack and evaporator coils. 4) Refrigerant leak detectors if required are by others. 5) Work to be performed at regular time hours 6) Remove old equipment to specified location

Post-Bid

Educational

$300,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
409
Active Projects
224
Bidding Soon
3,348
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 11, 2025

August 1, 2025

Project location map

Multiple Locations, Pasadena, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.