BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 11, 2025 at 8:00 PM

Updated August 12, 2025

Renovation of a mixed-use development in Hendersonville, North Carolina. Completed plans call for the renovation of a educational facility.

s of August 11, 2025, the project was awarded to Johnson Controls, with an awarded amount of $1,279,554.12. Question Deadline 06/03/2025 at 6:00 AM ET Question must be in written form by email or USPS letter on or before, but NLT date indicated. Submit all questions to the HC Capital Project Superintendent bcotton@hendersoncountync.gov All proposals must demonstrate compliance with all aspects of North Carolina law and Henderson County policy, including e-verification, terms and conditions and other requirements. Henderson County reserves the right to reject any or all proposals, waive technicalities and to be the sole judge of the suitability of the goods and services, for its intended use as allowed by law and further specifically reserves the right to make the award in the best interest of the County. Replace all Novar Controllers with new Building Automation System. The replacement system will be nonproprietary, BACnet capable, with an IP based head end. Henderson County Public Schools will have full control for schedules, setpoints, and all other components of the system. Each site will be required to have graphics on the headend with controller details and readings on the graphic. The new building automation system must meet the minimum specifications listed below: o All loads that are identified now in the Novar system will be added to the new system. o Verify that testing and commissioning have been properly done for each controller in writing. o Sensors for units must have: space temp, supply air temp, fan status, mode of operation, and humidity readings for each space. o New system must be open source- nonproprietary, BACnet capable, web based, Jace front end with graphics and controller readings for each space. o Fully unlocked system o 1-year single source warranty with all troubleshooting and repairs completed with no labor charges. o Substantial completion date of all sites inclusive to base bid is TBD o Liquidated damages of $500 a day will be applied, per day, past the date of substantial completion For purposes of coordination, primary contact for project information is: Name: Brian Cotton Title: HC Capital Projects Superintendent Address: 100 N. King St., Project Management, Hendersonville, NC, 28792 Phone Number: 828-845-5703 E-Mail Address: bcotton@hendersoncountync.gov Location of Work: Apple Valley Middle School 43 Fruitland Rd. Hendersonville, NC 28792 Flat Rock Middle School 191 Preston Lane East Flat Rock, NC 28726 Hendersonville Middle School 825 North Whitted St. Hendersonville, NC 28791 North Henderson High School 35 Fruitland Rd. Hendersonville, NC 28792 Rugby Middle School 3345 Haywood Rd. Hendersonville, NC 28791 Sugarloaf Elementary School 2270 Sugarloaf Rd. Hendersonville, NC 28792 West Henderson High School 3600 Haywood Rd. Hendersonville, NC

Award

Educational

$1,279,554.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
184
Active Projects
111
Bidding Soon
1,242
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 11, 2025

July 11, 2025

Project location map

Multiple Locations, Hendersonville, NC

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.