BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 31, 2025 at 8:00 PM

Updated August 1, 2025

Site work for a military facility in San Francisco, California. Completed plans call for site work for a military facility.

REPLACE RETAINING WALL BETWEEN BOCCE COURT AND VAN NESS. Question Deadline 06/20/2025 The National Park Service, Contracting Operation West, is seeking a qualified ion firm to install a new cast-in-place retaining wall at San Francisco Maritime NHP (SAFR). The Work will include the abandonment of an existing approximately 75 lineal foot lower wood retaining wall with ion of new cast-in-place concrete retaining wall in front of existing wall. New driven piles will be connected adjacent to existing wood piles to help support existing wall during the approximately 2 feet of vertical excavation for new concrete retaining wall footing. This work also includes the demolition of approximately 50 lineal foot upper wood retaining wall and replacing with new cast-in-place concrete retaining wall. Partial demolition and replacement of the existing sidewalk and fencing will be done to allow room for new concrete retaining wall ion excavation. Additionally, project will require the removal of designated trees, shed and foundation, benches, and existing vegetation. The estimated magnitude of the complete requirement is between 500,000 and 1,000,000. Period of : 07/30/2025 to 03/27/2026 All , requests for information, clarification requests, etc., must be submitted and received no later than 10 days prior to proposal due date, with the subject line: "Replace Retaining Wall Between Bocce Court and Van Ness Street.". all to Juan Roman. Contract Specialist, at juan_romannps.gov .Only written will be considered and responded to by the Contracting Office. The Contractor shall begin performance within 14 calendar days and complete it within 240 calendar days *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Military

$1,000,000.00

Public - Federal

Site Work

12

18

14

4

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
405
Active Projects
168
Bidding Soon
3,104
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 30, 2025

August 13, 2025

Project location map

Multiple Locations, San Francisco, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.