BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 18, 2025 at 8:00 PM

Updated June 19, 2025

Demolition, site work, paving and new construction of a bridge / tunnel in Schuyler, Nebraska. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Pedestrian bridge replacement. Remove existing 46 ft. long by 4 ft. wide bridge and replace with 70 ft. long by 10 ft. wide prefabricated steel truss pedestrian bridge. Question deadline - 30 May 2025 Questions received less than seven days prior to the date for opening of Bids may not be answered

Award

Bridges / Tunnels

$227,170.00

Public - City

Demolition, New Construction, Paving, Site Work

23

20

4

6

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
142
Active Projects
95
Bidding Soon
955
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 5, 2025

July 7, 2025

Project location map

To Be Determined, Schuyler, NE

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.