BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 11, 2025 at 8:00 PM

Updated July 12, 2025

Site work and paving for a mixed-use development in Fairway, Kansas. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Bids shall be on a unit-price basis for the Base Bid. The work generally includes: Volume I: Cold milling and asphalt overlay of the roadways on Buena Vista Street, Mohawk Lane, and Norwood Road, spot repair of concrete curb and gutter on all streets, concrete driveways, and pavement base repair as required. Volume II: LINE A - Approximately 88 LF of 15" storm sewer to be CIPP lined, two (2) combination inlets to be removed, disposed and replaced, and restoration of pavement, curb and gutter and surrounding area. LINE B - Approximately 132 LF of 15" storm sewer to be abandoned, installation of 169 LF of 18" storm sewer, a Type 2 curb inlet, grate inlet, a manhole, an 18" flared end section, removal and replacement of: 6' wood fence, 4' chain link fence, concrete driveway, grouted stone edging, grouted stone walkway, asphalt pavement, curb and gutter and restoration of the surrounding area. LINE C - Approximately 94 LF of 21" and 95 LF 24" storm sewer to be CIPP lined, one grate inlet, one combination inlet, and two manholes to be removed, disposed, and replace, and restoration of pavement, curb and gutter, driveway, and surrounding area. LINE D - Approximately 626 LF of 12" storm sewer to be CIPP lined, four (4) storm inlets to be removed, disposed and replaced with combination inlets, a manhole, to be removed, disposed and replaced, and restoration of curb and gutter, driveway, and surrounding area. LINE E - Approximately 324 LF of 12" storm sewer to be CIPP lined, two (2) combination storm inlets to be removed, disposed and replaced, and restoration of pavement, curb and gutter, and surrounding area. and other items as specified in the bidding documents and amendments thereto. See bidding documents for a complete project and bidding information. Please direct all questions to Bill Stogsdill, Director of Public Works, at bstogsdill@fairwaykansas.org

Award

Roads / Highways

$889,669.00

Public - City

Paving, Site Work

89

54

2

5

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
174
Active Projects
106
Bidding Soon
1,176
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 29, 2025

June 30, 2025

Project location map

Multiple Locations, Fairway, KS

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.