Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 15, 2025 at 8:00 PM
Updated September 16, 2025
Site work for a civil project in Fairway, Kansas. Completed plans call for site work for a water / sewer project.
The work consists of the following improvements to the Belinder Pump Station & PEFTF: Dry Weather Pump Station upgrades: o New dry pit submersible dry weather pumps (3 duty /1 standby) o New valves, piping, and fittings o Re-route discharge for dry weather flood pump o Replace dry weather sump pumps o Replace flowmeter vault plug valve, flow meter, and installation of bypass connection o Replace existing dry weather screens with multi-rake bar screens and a screenings washer/compactor with service water used for sluicing. Wet Weather Pump Station upgrades: o New self-priming PEFTF drain pumps (1 duty / 1 standby) o New 24-in. wet weather pump discharge piping and valves o New axial flow wet weather pumps o New wet weather wetwell drain pumps and floor drain sump pumps. Facility Expansion and Code Compliance Improvements: o New Electrical Room o New Chemical Room o New Engine-Generator o Reclassification and separation of spaces o Bathroom addition o New Stairwells Screening/dumpster room and garage structure upgrades: o Increased footprint for screening dumpster room. o The existing garage structure on the southwest side of the dry weather area will be removed and replaced with a double car garage type structure. The second bay will allow the screening room to be expanded to house the new sluiceway washer/compactor and associated dumpster. Chlorination and dechlorination upgrades: o Replacement of sodium hypochlorite system, including new feed pumps, level instrumentation, and one new storage tank. o Sodium bisulfite feed system includes two feed pumps and two chemical storage tanks. HVAC and plumbing upgrades: o New heating and cooling units. o Replacement of air handling units. o Associated removals and new ductwork. o New hose faucets throughout the pump station o New 6-in. private fire hydrant o New 3-in. water line to be connected to existing 1.5-in. water line Flood-proofing: o The project includes raising of doorways, etc. to be above the known flood elevation. Site Improvements: o Paving, sidewalks, grading. o PEFTF hatch adjustments, removals and additions. o Storm drainage piping and structures. o Landscaping including removals, seeding, tree and shrub plantings. PEFTF Improvements: o Addition of dechlorination piping and diffusers. o Modifications to PEFTF basin structure to reconfigure flow into serpentine channels. o Concrete repairs and modifications. o New access hatches for PEFTF basin structure. o Modification to existing structure for operational and compliance grab sample locations. All questions and bids shall be submitted through Online. Site walkthrough notes: No parking on the west side of Belinder Ave will be allowed. The other option would be to park and carpool from Old Mission Methodist Church, 5519 State Park Road, Fairway, KS 66205. The church has allowed us to use the south end of the parking lot. A parking map will be shared at the virtual pre-bid meeting. Doc Notes: Unless stated otherwise, all orders placed are non-refundable. Corporate, certified, or cashier's checks shall be made payable to Drexel Technologies. Contract Documents will be shipped only if the requesting party assumes responsibility for all related shipping charges. Please note: Download file release is not automated. Orders for downloads may take up to an hour to be processed. Local pickup available at: Drexel Technologies, 10840 West 86th Street, Lenexa, Kansas 66214-1632, (913) 371-4430. Question Deadline 07/10/2025 at 2:00 PM CT
Award
Water / Sewer
$17,384,000.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 24, 2025
August 25, 2025
5700 Belinder Ave, Fairway, KS
Related To This Project
Fairway, KS
Bid Date: Nov 20 2025
Fairway, KS
--
Fairway, KS
Bid Date: May 29 2025
Fairway, KS
--
Fairway, KS
Bid Date: Jan 24 2025
Fairway, KS
Bid Date: Apr 05 2024
Fairway, KS
Bid Date: Feb 08 2024
Fairway, KS
Bid Date: Apr 01 2022
Fairway, KS
Bid Date: Mar 09 2022
Fairway, KS
Bid Date: Mar 09 2023
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
