EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 13, 2025 at 8:00 PM

Updated June 14, 2025

Site work for a mixed-use development in Huntingdon, Pennsylvania. Completed plans call for site work for a playground / park / athletic field.

Project Title: Construct Solar Array PROJECT NO: FDC-507-10362 Location: GREENWOOD FURNACE STATE PARK, HUNTINGDON COUNTY, JACKSON General Contract Requirements: 1. The work under this project consists of providing and installing: a. A ground mounted, grid connected, solar array system that is interconnected on the load side of the electric meter providing a virtual net billing scheme (i.e. meter aggregation) at the Greenwood Furnace State Park & Rothrock State Forest Complex serving as the "Host" account and the remainder of the Complex's electric accounts serving as the "Parasite" accounts. The ground mounted array shall be installed in the open fenced-in field in front of Rothrock State Forest Greenwood Maintenance Headquarters along Greenwood Road(Route 305) with an approximate solar array system DC rating of 124.16kW utilizing single phase inverters and monocrystalline half-cut cell solar modules. The combined maximum allowable gross generator AC power output capacity of the solar array system shall be 100kW based on the 124.16kW DC rating resulting in a DC-to-AC ratio of 1.24. An acceptable DC-to-AC ratio range of 1.1 to 1.35 shall be achieved under this project. 2. The limits of work and requirements of the contract shall be as specified herein and as indicated on the contract drawings. 3. Work performed under the contract shall include, but is not necessarily limited to, the furnishing of all labor, superintendence, materials, tools and equipment, testing, commissioning, miscellaneous items and performing all work necessary to complete all construction to the satisfaction of, and subject to the approval of, the Department. 4. All construction work shown on the contract drawings and not expressly mentioned in the specifications, and all work specified and not shown on the contract drawings but obviously necessary for the proper execution of same shall be performed by the Contractor. It is expressly intended that the work of this contract shall provide complete and fully functional solar array system finished in every aspect and detail as would be considered industry standards, as it is not the intent to delineate or describe every detail and feature of the work. No additions to the contract sum will be approved for any materials, equipment and/or labor to perform work hereunder unless it can be clearly shown to be beyond the scope and intent of the drawings and specifications, and absolutely essential to the proper execution of the work. A. GREENWOOD STATE PARK (State Park Region No. 3) & ROTHROCK STATE FOREST GREENWOOD FURNACE MAINTENANCE HEADQUARTERS (Forest District No. 5): 1. This ground mounted solar array installation shall include all electrical and solar related work as depicted and defined in these specifications and on the contract drawings. Main items of work consist essentially of, but are not limited to the following: a. Ground mounted rack assemblies including beam pile (direct embedment) type foundations and structural racking systems. b. Solar array system including modules, string inverters, and cellular solar production web-based monitoring system installation, hookup, testing and commissioning. c. Site work including excavation, trenching, backfilling, finish grading, seeding and mulching related to underground primary & secondary electrical duct banks and Kiosk construction work. d. Electrical systems including primary and secondary AC distribution circuits, related AC and DC solar array circuits, electrical equipment, and construction of a solar array Kiosk for equipment mounting. e. Construction of utility service entrance equipment area with electric utility pad mounted transformer with fiberglass base and related bi-directional meter. f. Grid-tie and interconnect solar array system to the primary utility service overhead 7.2kV single phase distribution lines. g. Solar array system commissioning, start-up, testing, training, and demonstration of accessing the cellular solar production web-based monitoring system. h. Installation of electrical and solar equipment (Inverters, Communications Cabinet, Panelboard, and Disconnect Switch) on electrical kiosk located adjacent to utility service entrance equipment area. i. Finish grading and reseeding of solar array field and all disturbed and excavated areas.

Bid Results

Solar Power Generation

$499,900.00

Public - State/Provincial

Site Work

8

16

4

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Project Management and Coordination, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Construction Facilities, Sanitary Facilities, Vehicular Access and Parking, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Wood Framing, Engineered Wood Products, Sheathing, Underlayment
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Steep Slope Roofing, Shingles and Shakes, Asphalt Shingles, Joint Protection
Division 08 - Openings

Division 08 - Openings

Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Flooring, Wood Flooring, Carpeting, Painting and Coating
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, Hangers and Supports for Plumbing Piping and Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Hangers and Supports for HVAC Piping and Equipment, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Identification for Electrical Systems, Low-Voltage Electrical Distribution, Switchboards and Panelboards, Panelboards
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Commissioning of Earthwork, Earth Moving, Grading, Finish Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Excavation Support and Protection
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Manufacturing Equipment, Dies and Molds, Dies, Molds
Division 48 - Electrical Power Generation

Division 48 - Electrical Power Generation

Electrical Power Generation Equipment, Solar Energy Electrical Power Generation Equipment, Wind Energy Electrical Power Generation Equipment

Find More Local Projects

Within 75 Miles of This Project
76
Active Projects
43
Bidding Soon
638
All Active Projects
266
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 12, 2025

July 14, 2025

img_map_placeholder

15795 Greenwood Rd, Huntingdon, PA

Related To This Project


Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

Construct Solar Array

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.