Published June 13, 2025 at 8:00 PM
Updated June 14, 2025
Site work for a mixed-use development in Huntingdon, Pennsylvania. Completed plans call for site work for a playground / park / athletic field.
Project Title: Construct Solar Array PROJECT NO: FDC-507-10362 Location: GREENWOOD FURNACE STATE PARK, HUNTINGDON COUNTY, JACKSON General Contract Requirements: 1. The work under this project consists of providing and installing: a. A ground mounted, grid connected, solar array system that is interconnected on the load side of the electric meter providing a virtual net billing scheme (i.e. meter aggregation) at the Greenwood Furnace State Park & Rothrock State Forest Complex serving as the "Host" account and the remainder of the Complex's electric accounts serving as the "Parasite" accounts. The ground mounted array shall be installed in the open fenced-in field in front of Rothrock State Forest Greenwood Maintenance Headquarters along Greenwood Road(Route 305) with an approximate solar array system DC rating of 124.16kW utilizing single phase inverters and monocrystalline half-cut cell solar modules. The combined maximum allowable gross generator AC power output capacity of the solar array system shall be 100kW based on the 124.16kW DC rating resulting in a DC-to-AC ratio of 1.24. An acceptable DC-to-AC ratio range of 1.1 to 1.35 shall be achieved under this project. 2. The limits of work and requirements of the contract shall be as specified herein and as indicated on the contract drawings. 3. Work performed under the contract shall include, but is not necessarily limited to, the furnishing of all labor, superintendence, materials, tools and equipment, testing, commissioning, miscellaneous items and performing all work necessary to complete all construction to the satisfaction of, and subject to the approval of, the Department. 4. All construction work shown on the contract drawings and not expressly mentioned in the specifications, and all work specified and not shown on the contract drawings but obviously necessary for the proper execution of same shall be performed by the Contractor. It is expressly intended that the work of this contract shall provide complete and fully functional solar array system finished in every aspect and detail as would be considered industry standards, as it is not the intent to delineate or describe every detail and feature of the work. No additions to the contract sum will be approved for any materials, equipment and/or labor to perform work hereunder unless it can be clearly shown to be beyond the scope and intent of the drawings and specifications, and absolutely essential to the proper execution of the work. A. GREENWOOD STATE PARK (State Park Region No. 3) & ROTHROCK STATE FOREST GREENWOOD FURNACE MAINTENANCE HEADQUARTERS (Forest District No. 5): 1. This ground mounted solar array installation shall include all electrical and solar related work as depicted and defined in these specifications and on the contract drawings. Main items of work consist essentially of, but are not limited to the following: a. Ground mounted rack assemblies including beam pile (direct embedment) type foundations and structural racking systems. b. Solar array system including modules, string inverters, and cellular solar production web-based monitoring system installation, hookup, testing and commissioning. c. Site work including excavation, trenching, backfilling, finish grading, seeding and mulching related to underground primary & secondary electrical duct banks and Kiosk construction work. d. Electrical systems including primary and secondary AC distribution circuits, related AC and DC solar array circuits, electrical equipment, and construction of a solar array Kiosk for equipment mounting. e. Construction of utility service entrance equipment area with electric utility pad mounted transformer with fiberglass base and related bi-directional meter. f. Grid-tie and interconnect solar array system to the primary utility service overhead 7.2kV single phase distribution lines. g. Solar array system commissioning, start-up, testing, training, and demonstration of accessing the cellular solar production web-based monitoring system. h. Installation of electrical and solar equipment (Inverters, Communications Cabinet, Panelboard, and Disconnect Switch) on electrical kiosk located adjacent to utility service entrance equipment area. i. Finish grading and reseeding of solar array field and all disturbed and excavated areas.
Bid Results
Solar Power Generation
$499,900.00
Public - State/Provincial
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Division 01 - General Requirements
Division 04 - Masonry
Division 06 - Wood, Plastics, and Composites
Division 07 - Thermal and Moisture Protection
Division 08 - Openings
Division 09 - Finishes
Division 22 - Plumbing
Division 23 - Heating Ventilating and Air Conditioning
Division 26 - Electrical
Division 28 - Electronic Safety and Security
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 34 - Transportation
Division 35 - Waterways and Marine Construction
Division 41 - Material Processing and Handling Equipment
Division 48 - Electrical Power Generation
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 12, 2025
July 14, 2025

15795 Greenwood Rd, Huntingdon, PA
Related To This Project
Huntingdon, PA
Bid Date: Apr 11 2019
Huntingdon, PA
Bid Date: Mar 14 2019
Huntingdon, PA
Bid Date: Jun 17 2025
Huntingdon, PA
Bid Date: Jun 09 2025
Huntingdon, PA
Bid Date: May 20 2025
Huntingdon, PA
Bid Date: Apr 15 2021
Huntingdon, PA
Bid Date: Apr 30 2025
Huntingdon, PA
Bid Date: Apr 14 2025
Huntingdon, PA
Bid Date: May 06 2025
Huntingdon, PA
Bid Date: May 06 2025
Huntingdon, PA
Bid Date: Apr 07 2025
Huntingdon, PA
Bid Date: Apr 03 2025
Huntingdon, PA
Bid Date: Apr 07 2025
Huntingdon, PA
Bid Date: Mar 24 2025
Huntingdon, PA
Bid Date: Mar 11 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Find. Bid. Win. Your Next Project Starts Here.
ConstructConnect gives you the tools to search, analyze, and bid on verified commercial projects before your competition. Explore detailed project data, bidding timelines, and contact info—right when you need it.
Sign up now to get free company and project data instantly. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.