Published July 17, 2025 at 8:00 PM

Updated August 20, 2025

Site work for a service station / car wash facility in Santa Barbara, California. Completed plans call for site work for a service station / car wash facility.

The Santa Barbara Metropolitan Transit District (MTD), a public transit operator, is accepting bids to upgrade existing electric vehicle charging infrastructure and install new medium- and heavy-duty electric vehicle chargers. The project includes: Installation of new owner-furnished/contractor-installed ChargePoint bus charging systems within the Haley Street Canopy. Charging equipment consists of (4) level 3 DC fast charger cabinets with a total of (14) connectors and (3) level 2 chargers; New lighting fixtures and controls within both wings of the electric bus canopy building and the fuel island; Painting the electric bus canopies, fuel island, and gutter system replacement; Supporting electrical infrastructure and modifications to existing electrical panels for connections of new charging equipment; Structural work includes new concrete housekeeping pads in the electrical room and support framing for the new dispenser cabinets attached to the existing canopy building; and Cellular repeater system installation under the Haley Street Canopy and Maintenance Canopy. All work within the Maintenance Canopy is an alternate bid. Hand-delivered sealed bids shall be accepted by appointment. MTD administrative offices are currently closed to the public. Deliveries can be accepted by pre-arranging a delivery time Monday through Friday, from 8:00 AM - 5:00 PM (local time). To make a delivery appointment call 805-963-3364 ext. 200. This Supplemental Scope Document is a Responsability Matrix intended to provide additional clarity and detail regarding the delination of responsibilities between the Provider of Owner-Furnished Products (ChargePoint) and the Bidding Contractor (Contractor) required to install said products. This document serves to expand upon the requirements outlined in the primary Contract Documents, including drawings and specifications, without overriding or conflicting with them. The list of ChargePoint Reference Documents below are provided to assist the contractor during installation. Requests for change and clarifications due Wednesday, May 28, 2025, 10:00 AM, by email to purchasing@sbmtd.gov CHARGEPOINT : Provider of Owner-Furnished Bus Charging Systems Contact: Nina Pisano, Project Manager, 480-278-7624, nina.pisano@chargepoint.com Responsible for providing assistance in administering the Contract for Construction between Owner and Contractor; specifically, the installation and commissioning of the ChargePoint charging equipment. The terms of the scope of services are dictated by a separate contract between Owner and ChargePoint.

Award

Service Station / Car Wash

$1,104,355.00

Public - City

Site Work

21

24

20

8

Subscribe For Documents

36 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
123
Active Projects
39
Bidding Soon
961
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 8, 2025

August 1, 2025

Project location map

550 Olive St, Santa Barbara, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.