Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 8, 2025 at 8:00 PM
Updated August 9, 2025
Site work and outdoor lighting for a playground / park / athletic field in Chesnee, South Carolina. Completed plans call for site work for a playground / park / athletic field; and for outdoor lighting for a playground / park / athletic field.
Spartanburg County School District Two is seeking offers from qualified sources for installation of softball field and track exterior athletic lighting at Chesnee High School (795 S. Alabama Ave., Chesnee, SC 29323). Question Deadline 7/23/2025 at 10:00 AM ET please direct questions to Leslie Duthie at leslie.duthie@spart2.org Any protest must be submitted in writing to the Chief Finance Officer, Brandi Gist, 3231 Old Furnace Rd, Chesnee, SC 29323 or to brandi.gist@spart2.org The District assumes no responsibility for the delivery of any solicitation, addendum, solicitation response, or any other such correspondence by the US Postal Service, electronic transmission, facsimile, or any other method. "RFP#2509 Chesnee Athletic Field Lighting" Attn: Leslie Duthie Procurement Department It is the intent of Spartanburg School District 2 (hereinafter referred to as the "District") to solicit bids for installation of softball field and track exterior athletic lighting at Chesnee High School (795 S. Alabama Ave., Chesnee, SC 29323). The district is made up of 2 high schools, 3 middle schools and 9 elementary school with an enrollment over 11,000 students. SUMMARY A. Work covered by this section of the specifications shall conform to the contract documents, engineering plans as well as state and local codes. B. The purpose of these specifications is to define the lighting system performance and design standards for Chesnee High School using an LED Lighting source. The manufacturer / contractor shall supply lighting equipment to meet or exceed the standards set forth in these specifications. C. The sports lighting will be for the following venues: 1. Softball 2. Track 3. Field D. The primary goals of this sports lighting project are: 1. Guaranteed Light Levels: Selection of appropriate light levels impact the safety of the players and the enjoyment of spectators. Therefore light levels are guaranteed to not drop below specified target values for a period of 25 years. 2. Environmental Light Control: It is the primary goal of this project to minimize spill light to adjoining properties and glare to the players, spectators and neighbors. 3. Cost of Ownership: In order to reduce the operating budget, the preferred lighting system shall be energy efficient and cost effective to operate. All maintenance costs shall be eliminated for the duration of the warranty. 4. Control and Monitoring - To allow for optimized use of labor resources and avoid unneeded operation of the facility, customer requires a remote on/off control system for the lighting system. Fields should be proactively monitored to detect luminaire outages over a 25-year life cycle. All communication and monitoring costs for 25-year period shall be included in the bid. a. Control and monitoring system shall provide contactor control of all existing circuits. Key switches shall be provided to provide field-level control of existing circuit groups.
Award
Playgrounds / Parks / Athletic Fields
$300,000.00
Public - County
Outdoor Lighting, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 31, 2025
August 25, 2025
795 S Alabama Ave, Chesnee, SC
Related To This Project
Chesnee, SC
Bid Date: Jul 08 2025
Chesnee, SC
Bid Date: Jul 15 2025
Chesnee, SC
Bid Date: Feb 19 2026
Chesnee, SC
Bid Date: Jun 09 2025
Chesnee, SC
Bid Date: May 14 2025
Chesnee, SC
Bid Date: May 14 2025
Chesnee, SC
Bid Date: Apr 29 2025
Chesnee, SC
Bid Date: Apr 24 2025
Chesnee, SC
Bid Date: May 07 2025
Chesnee, SC
--
Chesnee, SC
Bid Date: Mar 19 2025
Chesnee, SC
Bid Date: Mar 04 2025
Chesnee, SC
Bid Date: Nov 22 2024
Chesnee, SC
--
Chesnee, SC
Bid Date: Sep 05 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
