Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 20, 2025 at 8:00 PM
Updated June 21, 2025
Site work and paving for a road / highway in Troutdale, Oregon. Completed plans call for site work for a road / highway; and for paving for a road / highway.
WORK TO BE DONE: The work to be done consists of three phases of Pavement Maintenance treatments: street pavement reconstruction, slurry sealing, and asphaltic pavement repair. The street pavement reconstruction phase consists of: _ Removal of approximately 2,354 square yards of 2" - 4" deep existing surfacings _ Approximately 687 cubic yards of general excavation _ Removal and replacement of approximately 5 feet of 18-inch concrete storm pipe, 3-foot depth _ Insta lation of approximately 834 tons of 1"-0 aggregate base _ Insta lation of approximately 642 tons of level 2, _" ACPase consists o The street reconstruction phase sha l have a 21 calendar day performance time and must be completed not later than August 29th, 2025. The slurry seal phase consists of asphaltic pavement surface preparation and application of Type II Slurry Seal on approximately 61,000 square yards of City of Troutdale streets. The slurry sealing phase sha l have a 30 calendar day performance time and must be completed not later than August 29th, 2025. The asphalt pavement repair phase consists of approximately 500 square yards of 4" asphalt concrete pavement repair. The asphalt pavement repairs to each given street must be completed before the slurry seal can be ap plied. The asphalt pavement repair phase sha l have a 60 calendar day per formance time. A l work must begin no earlier than July 1st, 2025. Questions and requests for clarification related to this Work sha l be directed to the project manager, Christopher Priano, 342 SW 4th Street, Troutdale, OR 97060, (503) 674-3312, christopher.priano@ troutdaleoregon.gov. PREVAILING WAGE: This is a contract for a public work subject to ORS 279C.800 to 279C.870. PRE-QUALIFICATION: Prequalification is not required. However, contrac tors must submit the Contractor Responsibility Inquiry Form with their bid (see Special Provisions 00120.03). *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Bid Results
Roads / Highways
$668,365.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 5, 2025
July 1, 2025
Multiple Locations, Troutdale, OR
Related To This Project
Troutdale, OR
--
Troutdale, OR
Bid Date: Apr 14 2021
Troutdale, OR
Bid Date: Nov 13 2025
Troutdale, OR
Bid Date: Nov 25 2025
Troutdale, OR
Bid Date: Jun 04 2025
Troutdale, OR
--
Troutdale, OR
--
Troutdale, OR
--
Troutdale, OR
Bid Date: May 20 2025
Troutdale, OR
Bid Date: Jul 21 2025
Troutdale, OR
Bid Date: Feb 23 2022
Troutdale, OR
Bid Date: Apr 17 2025
Troutdale, OR
Bid Date: Apr 22 2025
Troutdale, OR
Bid Date: Apr 17 2025
Troutdale, OR
Bid Date: Jan 28 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
