Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 22, 2025 at 8:00 PM
Updated July 23, 2025
Site work for a water / sewer project in Ellis, Kansas. Completed plans call for site work for a water / sewer project.
This project has been awarded and will be completed in 2 phases. Phase 1 was completed in July of 2025. Phase 2 will begin after the end of the school year in summer of 2026 and be completed before school begins in the fall of 2026. This project was awarded to High Plains Home Improvement out of Gove Kansas at the amount of $92,912 for phase 1 and $210,000 for phase 2. The below original solicitation has been left for reference. Request for Proposal Sewer Lining at Ellis High School Items 1-3 are to be bid as a single job. All work must be completed outside of the school day (weekends, nights, Summer, and Holiday breaks), and will not cause any part of the school system to be shut down while in use. All work must be completed in full by July 15, 2025. Bids for Items 1-3 must include all preparation and additional cleaning necessary to successfully complete the job. 1. Approximately 315' Liner for 4-6" sewer lines, approximately 55 reinstatements, cutting access holes, repairing concrete at access holes. Job to include the cleaning and prepping of all lines to be lined. This job is to line the cast iron 4-6" drain lines under the concrete from the wood shop/ metal shop locker room area to the science room tunnel (plumbed in PVC) and then from the tunnel under the gang restrooms towards the front office area and on out to the clay tile outside of the building. Includes the staff restrooms. 2. Approximately 535' Liner for 4" sewer lines, approximately 55 reinstatements, cutting access holes, repairing concrete at access holes. Job to include the cleaning and prepping of all lines to be lined. This job is to line 4" cast iron from the ag shop pit drain through the Home Economic classroom and maintenance room into the boiler room, includes the kitchen line as far as the 4" goes. Through the boiler room (several turns) and out the east side to the clay tile. Includes the line to the laundry room and the boys locker room. Includes the girls locker room and out to the clay tile. Items 3-5 is to be bid as a possible addition to Items 1-2. USD 388 understands that the quote to complete Item 4 is only good if done in conjunction with Items 1-2. USD 388 requests that the quote for Item 4 be separate so that the Board of Education can decide whether it is financially prudent to do at this time. 3. Video inspection of the Kitchen and Locker Room drains to determine need for liner repair work. 4. Cleaning and preparation work to install liner and pre-liner if it is determined repair work is needed in the Kitchen and Locker Room drains 5. Installation of liner and pre-liner in the Kitchen and Locker Room drains Questions may be sent to Superintendent Janice Wilson at jwilson@usd388.com.
Award
Water / Sewer
$302,912.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 23, 2025
June 23, 2025
1706 Monroe St, Ellis, KS
Related To This Project
Ellis, KS
--
Ellis, KS
--
Ellis, KS
Bid Date: Feb 15 2024
Ellis, KS
Bid Date: Jul 20 2022
Parsons, KS
Bid Date: Aug 14 2025
Wichita, KS
Bid Date: Jun 09 2025
Wellsville, KS
Bid Date: Jun 05 2025
Topeka, KS
Bid Date: Jun 17 2025
Andover, KS
Bid Date: Jun 03 2025
Leavenworth, KS
Bid Date: May 28 2025
Westwood Hills, KS
Bid Date: May 28 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
